Loading…
Loading…
11,104 results • Best match
Construction of CC road with NALI Main Gate SE SHAMSHAN KI AUR GRAM PANCHAYAT DABALANA PS HINDOLI
In Ward 76, English Ganj Reti, the construction of drains and a concrete road from Hamid Sonars street, Qazirs house, to Babbu Patang and the well, and in Mohammad Zakhira, the construction of drains and a concrete road in front of St. Wali School, v
Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692)
87.Construction of CC road, drain, and slab in Jaswant Pal lane in Ward No. 18, Sarai Dayanat.
Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil excavation to be done in form of regular pits not exceeding ½ M in depth and earth work to be done in 20 cm. layers including ramming and dressing pulvarization the surface ...
Construction of interlocking road and CC drain from Ramrati house to Siyaram Pal house in ward no. 04.
Construction of granular sub-base by providing by close graded material to mixing in a mechanical mix plant at OMс, carrige of mixied material to work site, spreding in uniform layers with motor garder on perpared surface and compacting with vibrantory power roller to achive the desired destiny com. as per clause 401 all com. work etc.
Construction of of Culvert at Ramiya Colony Main Road Kamaraj Nagar 1st Street Junction in Ward No 30
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring ...
Permanent Restoration on Kundal Affani road by way of construction of R/wall in Km 1st RD(725).
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:70%OS 20%OR 10%HR