Loading…
Loading…
10,652 results • Best match
To prevent water logging, construction of CC road from Raghuveersharan house to Amit house in Ward No. 20, Mohalla Ramnagar.
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grde cement, mixed in a concrete mixer, using approved mix design , laid in approved fixed side formwork (steel channel, laying ,including levelling the formwork as per drawing), curing of concrete for 14-days & work as per SI No-20.14(a) Complete
Construction of road by way of Macadamisation from H/o Mushtaq Ahmad Khan to dead end at Khan colony, Chanapora
Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge.
PRAPOSED CONSTRUCTION OF CEMENT CONCRETE ROAD AT NEAR OF PUBLIC TOILET, PALKHI TAL WAKHARI IN P.PUR CITY FOR PANDHARPUR M.C
PRAPOSED CONSTRUCTION OF CEMENT CONCRETE ROAD AT NEAR OF PUBLIC TOILET, PALKHI TAL WAKHARI IN P.PUR CITY FOR PANDHARPUR M.C
Construction of protection wall to landslide portion of road in Chennagonda village Chennagonda G P sagara taluk (Reserved for ST).
... ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely............................................................................... ...
Construction of PCC road from Mondal Pukurpar to Natun Pukurpar at Bigha village under Putsuri GP of Monteswar Block, Purba Bardhaman,Fund-BEUP(2022-23)(1st and 2nd Phase)
Construction of PCC road from Mondal Pukurpar to Natun Pukurpar at Bigha village under Putsuri GP of Monteswar Block, Purba Bardhaman,Fund-BEUP(2022-23)(1st and 2nd Phase)
CONSTRUCTION OF PCC ROAD FROM 1 RAJKUMAR SHARMA HOUSE TO MAHESWAR SHARMA HOUSE IN PHUDINIDIH 2 IN PRAPATI ESTATE NEAR BASURI HOUSE PLOT NO 88 3 IN KUNJ VIHAR PHASE 1 MAIN ROAD AND CONSTRUCTION OF SLAB OVER DRAIN IN SHREE RAM HOUSHING COLONY NO 03 UN
... bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal ...