Loading…
Loading…
11,636 results • Best match
LAC-ADS-2025-26 - Peravoor LAC Sri. Sunny Joseph MLA-Construction of Various Roads in Muzhakkunnu G-1) Mahathma Gandhi Road,2) Koranji-Koodalat Road- General Civil Work (Re-tender)
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Construction of rcc nala work from kapli gav main road Under Ward-53 Zone-5
mild steel of iron work in plane workforcedment concret or reinforsment brick work (when not included inoverall rates) WROUGTH to required shape as necessery including binding for proper complaction of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level/(Over all Rate) 12mm to 32mm tor
Road development work.
Road development work Beside Govt school Kammasandra Yelooramma temple road in ward no 31 of CMC hebbagodi limits.
Road development work.
Road development work Beside Govt school Kammasandra Renuka yellamma temple road in ward no 31 of CMC hebbagodi limits.
Construction of RCC Road, Yard Metal Spreading, P/F Razor coil on existing CW, Parking shed, Colour Work of Control Room & Compound Wall and misc. civil works at 66 KV Panchbatti S/S & renovation of EE AM Bharuch office under Bharuch AM Division under Bharuch Circle.
SE (TR) invites “On line Tenders” (e-tendering) for the “Construction of RCC Road, Yard
Civil Work
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared subbase, with 43 grade cement or anyother type as per Clause 602.2.2M30 (Grade), coarse and fine aggregates conforming toI S:383, maximum size of coarse aggregate not exceeding 31.5mm, mixed in a concrete mixer of not less than 0.5cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Form work (steel channel, laying and fixing of 150micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for14- days, using water finishing to line sand grade as per drawing and MoRTH Specification Clause 602 including vaccumde watering process with all required equipments (Dowel Bars will be paid seprately)