Loading…
Loading…
1,47,244 results • Best match
Construction for Road Restoration Work in Om City, testing and commissioning with one year defect liability period with all appurtenant works Under Om City and Kusum Vihar Colony, Sewerage Scheme Dehradun.
Prime Coat 5-1-1 Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Recovery and Restoration (Land Slide) works of Garidhura-Mirik-Simanabusty Road at Chainage. 30.6, 26.95 and 32.9 Km for mending up damages occurred due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling
eProcurement System of Government of West Bengal Created By: ANANDAMOY MONDAL Created Date/Time: 14-Jan-2026 06:20 PM Tender Title: Recovery and Restoration (Land Slide) works of Garidhura-Mirik-Simanabusty Road at Chainage. 30.6, 26.95 and 32.9 Km Tender ID: 2025_WBPWD_946906_7
Road Work
FDR-2024-25-FDR- Construction of drain and allied works in Kattakada Kottoor road between poovachal and pezhumoodu.-Civil work.- General Civil Work
Ladhurka-Gamarkuli Road from 1.00 Kmp to 6.0 Kmp, Repairing works with premix surfaceing and seal coal in stretches under Purulia Highway Division in the District of Purulia.
Tender Inviting Authority : EXECUTIVE ENGINEER, PURULIA HIGHWAY DIVISION, P.W. (ROADS) DIRECTORATE.
Emergent Damage Repairing of a culvert and protection work of Embankment near the culvert at 33.996 Km of Chanditola-Seakhala-Champadanga Road of Jangipara Highway Section of Serampore Highway Sub Division Office under Hooghly Highway Division-I.
Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-in-charge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly. New Set