Loading…
Loading…
32 results • Latest
Calibration of various types of laboratory equipment instruments apparatus installed in the Civil Engineering laboratories at RCTRC Kalyani Nadia
RING & BALL APPARATUS
Patna - Gaya (DN): Through Track Renewal (TRR/P) - 34.492 TKm & other misc track works under ADEN/JHD.
cum DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
Supply of Lab Mechanical Equipments
Lab Equipment
TRR (P) Work = 2.24 TKM, TTR - 08 Set, Through Ballasting of Points and crossing in Patna - Jhajha section and TRR of left over work of CTR(S) on Addnl. main line & Addnl. Loop Line and other associated track maintenance works under Sr.DEN/Track/DNR Section
550.00 from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in- charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
Proposed Interior Works including Science themed Exhibits and allied Civil and MEP Services works at Science Park on Plot no. 50A, Sector-19A, Nerul, Navi Mumbai
DFSITC of following Cell lab exhibit. A hands-on laboratory experience featuring interactive exhibits focused on the cells and anatomy of living organisms. This lab is fully equipped for live experiments and includes essential safety equipment such as aprons and personal protective equipment (PPE) kits. It boasts a minimum of six 24-inch Full HD touchscreens, each powered by a Mini PC loaded with specialized content to elucidate cell structures. The lab's construction will be robust, resistant to chemicals, and fireproof. All design concepts, intentions, and detailed shop drawings will require approval before the commencement of construction. itemH2Code5 _ * #,##0.00_ ;_ * \-#,##0.00_ ;_ * "-"??_ ;_ @_ Nos. Excess(+) Full Conversion INR
Equipment and sensor trainer for I Mech Trade
Potentiometer/thermocouple test set