Loading…
Loading…
1,291 results • Latest
Providing Iron Scaffolding to Main Temple for Maha Kumba Abhishekam-2026.
Providing, erecting, maintaining and dismantling floor-wise steel scaffolding for unsupported height up to 3.66 m using approved quality MS/GI steel pipes, adjustable jack props, steel centering/base plates, clamps and couplers, including racings, ledgers, transoms, joint pins, working platforms with Wooden planks / chequered plates, steps / ladder access leading to platform with handrails, guard rails and toe boards, erected with clamp fixing system, complete, ensuring the entire arrangement is tight, stable, plumb and safe, as directed by Engineer-in-Charge. Including Cost of all materials, labour for erection, maintenance and dismantling, tools & tackles, shifting and repositioning, safety arrangements, leads & lifts, overheads and contractor’s profit — complete in all respects. (Ground floor 1st stage)
DELIVERY SHORTING AND FABRICATION OF REQUIRED MATCHING PIECES FOR HAULING OF 2000 GPM KBL PUMP-02 NOS.AND 3000 GPM FLOW MORE PUMP AT WEST CORNER 5 TIMES DUE TO INCREASING WATER LAVEL AT AKWMC,OCP UNDER KATRAS AREA.(2) HAULING OF 150 HP PUMP FROM 27 P
(3) SHIFTING OF 800 GPM PUMP MOTOR SET COMPLETE WITH ELECTRICAL AND MECHANICAL FROM DEPARTMENTAL SUMP IN OCP,WMC,AND RE-INSTALLATION ALSO 8" PIPE DELIVERY RANGE SHIFTING APPROX 100 MTR AT AKWMC.:- DISMANTLING OF PUMP MOTOR SET,SUCTION,8" SLUCE VALVE,8" NON RETURN VALVE AND DELIVERY. 07 HEAD X 01 SHIFT)(H/SK-02X502.44+SK- 5X434.96)= 3179.68
Construction of parking opposite plot No. 181/26 to 181/31 in Industrial Area Ph-1, Chandigarh
Dismantling of cement concrete PCC tiles and shifting the servicable PCC tiles propely within average lead of 2 KM including loading and unloading and stacking at designated places and disposal of the unservidceable PCC tiles withn aeverage lead of 2 KM . The reates also includes cost of cleaning of Cement sand mortar complete in all respect to the enitre satisfaction of the Engineer in charge.
Repair/ replacement of summer appliances and certain E/M works under GE (East) Ferozepur Cantt
M & L for shifting of air conditioner split type of any make from its original position to another position with and including any B & R work reqd at site and electric work required at site for it complete all as specified and directed.
Construction of Bridge in Biswanath district i) Br. No. 1/2 on NH-15 to Dubia Borigaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/32
A Provisional sum (Fixed Amount) for the items of Utility Shifting and Occupational Health & Safety of Rs. 50,577.00 (not to be changed by the Bidders in BOQ)
Construction of Bridge in Sonitpur district i) Br. No. 1/1 on Bhakatgaon (Khalihamari) to Buragaon Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/26
A Provisional sum (Fixed Amount) for the items of Utility Shifting, Tree Cutting and Occupational Health & Safety of Rs. 5,59,830.00 (not to be changed by the Bidders in BOQ)