Loading…
Loading…
1,277 results • Best match
Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Solar Power Plant (Roof Top) for ONGRID System
REPAIR/MAINTENANCE OF 1MW SOLAR POWER GENERATION PLANT AT BAMBOLIM UNDER GE PANAJI
Note:- 1. The succsesfull bidder shall rectify the defects within 30 days of acceptance of the work order in the solar power plants such that minimum capacity utlisation factor (CUF) of 15% for plants is maintained. 2. The Contractor shall ensure the plant availability upto 99%. However, the plant availability due to grid outages will be considered only if the same are certified by the competent authority/ AGE. Any other outages which are not attributable to the Contractor and are certified by Department may also be considered. 3. Linear degradation of the module output (i.e., 0.75% of DC capacity at Std temp Condition per year) shall be considered for the calculation of CUF every year. 4. The contractor shall perform periodic overhauls and preventive maintenance required for the plant. 5. In order to optimise the useful life of equipment of solar power plant , the contractor shall carry out necessary routine , breakdown and preventive maintenance. 6. The contractor shall carry out the performance monitoring for the plant facility on continuous basis and in case of any deviation contractor shall perform the due diligence appropriately to find out the actual root cause of such deviation. any test or spection required such as thermal imaging, current voltage (IV) characterstics test, PTC to analysis such deviation will be the responsibility of the contractor thereafter corrective action reuired to mitigate such deviation shall be undertaken by the the contractor without any additional cost. 7. The Contractor shall ensure minimum Capacity Utilisation Factor (CUF) as specified in the contract during the entire AMC period. 8. The Contractor shall maintain overall plant availability up to 99%, excluding certified grid outages and departmental shutdowns. 9. All breakdowns affecting generation shall be attended on priority and rectified within the stipulated time to avoid generation loss. 10. Mandatory spare parts required for uninterrupted operation of the Solar Power Plant shall be kept readily available at site at all times during AMC period. 11. The Contractor shall maintain the earthing resistance value within permissible limits. In case the earthing value exceeds specified limits, necessary recharging/replacement/new earthing shall be carried out by the Contractor at no extra cost. 12. The Contractor shall strictly comply with all applicable safety standards, IE Rules, IS Codes, statutory requirements, and departmental safety procedures during execution of maintenance works. 13. Any defective equipment/components affecting performance and efficiency of the Solar Power Plant shall be repaired/replaced by the Contractor without any additional financial implication to the Department
Providing And Erecting Solar LED Street Light In Tanda Vasti At Village Mauje Fagane Tal Dhule Dist Dhule - Under Vasantrao Naik Tanda Vasti Sudhar Yojana
Cost of Work including appicable taxes Providing And Erecting Solar LED Street Light In Tanda Vasti ( वि.जा.भ.ज. गोपाळ / धनगर वस्तीत ) At Village Mauje Fagane Tal Dhule Dist Dhule - Under Vasantrao Naik Tanda Vasti Sudhar Yojana
Solar Lifting Pump Works at GP Singuni, Pipli
Design, survey, manufacture, supply, erection, testing, commissioning of 10 kWp and 5 kWp Solar Photovoltaic Power Plant at Block Offices etc. on turn-key basis throughout the state of Tripura as per DNIe-T
Design, manufacture, supply, erection, testing and commissioning of 5 KWp Solar Photovoltaic Power Plant (Hybrid) as per Scope of work and technical specifications mentioned at DNIe-T on turn-key basis
REPAIR, MAINTENANCE AND REPLACEMENT OF OLD VINTAGE STREET/ SECURITY LIGHT, GARDEN LIGHT, POST TOP LANTERN, BOLLARD LIGHT, SOLAR LIGHT AND ALLIED WORK AT U AREA UNDER AGE E/M OF GE SUKNA AT MIL STN SUKNA
23 S&F Solar All in One system 36 W Smart Integrated Solar Street Light with Built in Mono Crystalline Panel, Lithium Ferro Phospate (LiFeP0 4 ) 12.8V 24Ah Battery, MPPT Charge Controller and PIR Sensor with Colour Temperature 6000-6500K Suitable LED efficacy to have system efficacy of not less than 125 Lumen/Watt and Life of LED light fitting Not less than 50000 burning hours including fixing accessories like clamps of suitable size at existing pole and dismantling out old unsv ones complete all as specified and as directed. Note: 1.Contractor have to submit LM 79 and LM 80 report from NABL accredited Lab,Test Certificate and other relevant documents as directed by Engr-inCharge before approval of product. 2. Contractor will undertaking about warranty certificate of 50000 hr burning life. 3. Cost of taking down old unsv fittings is deemed to be included in unit quoted rates. 8 Each Excess(+) Full Conversion INR