Loading…
Loading…
1,271 results • Best match
Estimate for the cost of maintenance of five line solar power fencing at Velanplavu under Rajampara FS under Ranni Range during 2026-27
Solar panel 100 Watt 12V.
Estimate for the cost of maintenance of five line solar power fencing at Mandapuzha under Rajampara FS under Ranni Range during 2026-27
Solar panel 100 Watt 12V.
Construction of 400 Bedded boys Hostel Building at JIPMER Campus, Puducherr.(Civil Work): Building Portion including internal water supply lines, Sanitary Installation. drainage, demolition of existing quarters & other development works. (Electrical ... LPD Solar Water ... Solar Water Heater, ... Water Heater , ...
Estimate for the cost of maintenance of five line solar power fencing at Bimmaram under Rajampara FS under Ranni Range during 2026-27
Solar panel 100 Watt 12V.
REPAIR/ REPLACEMENT OF BLDG SECURITY LIGHT, LIGHTENING CONDUCTOR, SOLAR OPERATED EQPTS AND REPAIR/ MAINT OF LT POWER CABLES, POLES AND EARTHING AND CONNECTED WORKS AT KASAULI UNDER GE KASAULI
Comprehensive maintenance of LED Solar Street light fitting of any make any model fitted on the pole at any height with any type of fixing arrangement by checking all connections, replacing the drivers/ Controller, surge protection device, control wiring copper wire and lugs, battery, solar PV modules all as directed by Engineer in charge. Comprehensive maintenanace also includes taking down street light fitting of any capacity from any height from the pole and increase or decrease the height of the fixing arrangement by removing the bent pipe and clamps and refixing it to the proper height and removing all the hanging wires, cables, PVC pipes, old rusted clamps, hanging aluminium wires, hanging grasses etc and tightening of all nuts, bolts, clamps and fixing of the street light at proper direction to the satisfaction of Engineer in charge) Spares under Comprehensive Maint should be measured and paid seperately complete all as specified and directed.
COMPREHENSIVE MAINTENANCE AND MANNING, OPERATION FOR SOLAR PHOTO VOLTAIC (SPV) POWER PLANT OF CAPACITY 5 MW AT MHOW UNDER GE MCTE MHOW
Item No. 3.00 Material & labour for Solar Photovoltaic PV modules not less than - 325 Wp, MNRE approved Polycrystalline/ Monocrystalline silicon module for first month to 11th month