Loading…
Loading…
1,278 results • Best match
AUGMENTATION OF WATER SUPPLY SCHEME NANDGARH KOTRA FROM TUBEWELL TO CANAL BASED BLOCK RAMPURA DISTRICT BATHINDA UNDER NABARD XXXI PROJECT
AUGMENTATION OF WATER SUPPLY SCHEME NANDGARH KOTRA FROM TUBEWELL TO CANAL BASED BLOCK RAMPURA DISTRICT BATHINDA.. (UNDER NABARD XXXI PROJECT) Providing and Laying 160mm o/d PVC Pipe Inlet Channel 4 Kg/CM2 Including Excavation , Construction of New S&S Tank, RCC S&S Well, Supplying Installation of PSF Capacity 20 Cum, RCC Clear Water Tank, Disinfection Unit Electrically Based Chlorination Plant, Repair of (Existing Pump Chamber,Existing OHSR 75 Cum Capacity) Pipe line Head Works, Site Laying, Pumping Machinery, Solar Panel and Distribution Pipe line of UPVC Pipe (6KG/CM2) 63mm o/d including Excavation, Sluice Valves, New Water Connection and Repair of Existing Water Connection Etc. and Carriage of Material Complete in all other Works Contingent thereto.
Supply of Electrical Spare parts
40w All-in-one Solar LED Street Light Fittings
Selection of Implementation Partner for an ITES Project
Solar Panels (After Buy Back)
Howrah Division - Supply, Installation, Commissioning and Operation of Track Based Rail Lubricator (Electronic Type of 1 KM Category) along with Supply of Lubricant for Rail Lubricator as per site requirement with a minimum of 20Kg per month per Lubricator. Complete system should be as per RDSO Technical Specification IRS T48 (Vers. 5 of latest) for 5 years Under The Jurisdiction of HWH Division ( Total -49 Nos.)
Supply, Installation and Commissioning of Track based Rail Lubricator (Electronic type) with dual applicator / wiper bar complete system as per RDSO's technical specification No.IRS- T-48 version 5. Supply of solar panel and its accessories including battery and mast for successful operation of Lubricator. The Firm has to inspect each location regularly for operation and maintenance not less than 15 days for each curve. Power Supply : Application system should be designed to accomodate both Direct electrical connection to an AC power source and to operate 1 independently using a solar panel and battery as per para 7.2 of RDSO Technical specification for Track based Lubricator. The rate includes all tools, plants, parts, labour, taxes, transportation, royalty etc., complete job. The rate also includes the cost of parts and AMC for 5 years. The machine and the Solar panel Assembly will be the property of the Contractor, which will be taken back by Contractor after successful completion of job (i.e. after 5 years). The rate also includes the testing of Grease for its suitability as per RDSO specification (i.e. testing the Grease for its co-efficient of friction which should be less than 0.25 µ) shall be done by the tenderer at a frequency of 1 month." Note : (1) If the co- efficient of friction in above test is found above 0.25µ, then no payment for that month will be done by Railway. (2) Unit is Each month. (Qty=49 Lubricators x60 months= 2940 Nos.)
Comprehensive AMC (Annual Maintenance Contract) including Operations for Real Time Sensing and Monitoring Stations of Water Level and Discharge of Banbasa Barrage, Sarda Sagar Reservoir and Sarda Main Canal from Km. 0.00 to Km. 45.00
Comprehensive AMC for Monitoring Station established at Banbasa Barrage/ Head Regulator of Sharda Main Canal Comprising of: - Remote Terminal Unit with Data Logger - 1 No. Solar Power Supply with Battery Backup - 1 No. Radar type Water Level Sensor (15 Mtr) - 4 Nos. (Located at U/S & D/S of the Banbasa Barrage, Head of Sharda Main Canal and Head of Nepal Feeder Channel) VSAT Terminal with IDU, ODU, Antenna - 1 No. Including Civil Work done for installation of above Equipments.