Loading…
Loading…
17,121 results • Best match
Survey Design Fabrication Supply Installation Testing Commissioning of Total 20 KWP Of On Grid Connected Rooftop Solar PV Power Plant Including Comprehensive Maintenance Contract CMC For 5 Years
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TOTAL 20 KW OF “ON GRID” CONNECTED ROOFTOP SOLAR PV POWER PLANT INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT (CMC) FOR 5 YEARS
SURVEY DESIGN FABRICATION, SUPPLY INSTALLATION TESTING COMMISSIONING OF TOTAL 15 KW OF ON GRID CONNECTED ROOFTOP SOLAR PV POWER PLANT INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT CMC FOR 5 YEARS
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF TOTAL 15 KW OF “ON GRID” CONNECTED ROOFTOP SOLAR PV POWER PLANT INCLUDING COMPREHENSIVE MAINTENANCE CONTRACT (CMC) FOR 5 YEARS
Survey, Design, Fabrication, Supply, Installation, Testing and Commissioning of Total 60 kWp of On Grid Connected Rooftop Solar PV Power Plant Including Comprehensive Maintenance Contract (CMC) For 3 Years
REPAIR REPLACEMENT AND ROUTINE MAINTENANCE OF SOLAR WATER HEATER AT INHS ASVINI COLABA MUMBAI
M & L for rolled mild steel in joist,channel,angle or tee sections in framework for staging of water tank, solar panel etc including all necessory drilling, bolting,riveting or welding conforming to Fe-290 (Gde E-165) and embeding the supportin PCC bed block on roof top with suitable size FI hold fast including dismantling carefully existing staging complete all as specified. Note - The staging for water tank/solar panel shall be embedded in PCC block provided over RCC slab. No drilling in RCC slab shall be allowed for fixing staging and any damage due to any reason shall be made good by the contractor at his own cost.
DESIGN AND SITC OF ON-GRID ROOFTOP SOLAR POWER WORKS WITH NET-METERING SYSTEM AT SV2B, SV5B, IP4, IP5 AND IP7 STATIONS AT GAIL DBPL
Supply installation and commissioning of Solar System as per scope of works :- Electrical Panel suitable for solar with CT PT Erectionas per site requirement condition.
Solar Project 80 KWp Grid Connected Solar PV Power Plant under RoofTop Net Metering System with Remote Monitoring system along with 5 Years (CMC) at Planetarium Ratnagiri under jurisdiction of Municipal Council Ratnagiri
eProcurement System Government of Maharashtra Created By: Yatiraj Jadhav Created Date/Time: 15-Apr-2026 11:15 AM Tender Title: Solar Project 80 KWp Grid Connected Solar PV Power Plant under RoofTop Net Metering System with Remote Monitoring system along with 5 Years (CMC) at Planetarium Ratnagiri under jurisdiction of Municipal Council Ratnagiri Tender ID: 2026_DMA_1290893_2