Loading…
Loading…
1,435 results • Best match
CONSTRUCTION OF BLOCK-CUM-CIRCLE OFFICE-CUM-RESIDENTIAL BUILDING AT PIPRAKOTHI BLOCK IN THE DIST EAST CHAMPARAN FOR THE YEAR-2026-27.
Supply, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specification as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module conversion efficiency shall not be less than 16.5% PV modules used in solar power plants/systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Connections and interconnections by supplying & fixing required size XLPE insulated copper conductor 1.1 kv grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories complete job etc. as required. (Including 5.36% GST) Make-Tata Power/Adani/Vikram solar/Waaree
RESTORATION OF DEANS BUNGALOW AND PROVISION OF ART GALLERY, J.J COLLEGE CAMPUS, GREATER MUMBAI - PHASE II.
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 28 mm for solar water heater/AC system.
CONSTRUCTION OF BUILDING FOR ECHS POLYCLINIC TYPE D AT PALI (NON MILITARY STATION) UNDER GE BANAR
Supply, installation, testing, and commissioning of a 9.81 kWp grid-connected rooftop solar PV system utilizing 144-cell Bifacial Mono Crystalline Half-Cut PERC modules rated at 545 Wp per module, coupled with a 10 kWp string inverter for high-efficiency energy conversion. The system includes a robust galvanized iron mounting structure designed to optimize sunlight exposure and withstand wind speeds up to 150 km/h. Additional components include high-quality DC and AC cables, DC and AC distribution boxes with surge protection devices, copper-bonded earthing, lightning arrestors, and ISI-marked UPVC conduits for cable routing. The setup integrates an internet-based remote monitoring system and bi-directional net metering to enable seamless energy management and monitoring. The project ensures compliance with IEC standards, and commissioning support to promote efficient and reliable solar energy generation for long-term sustainability, complete as per below specifications:
Construction of footpath with railing at Thasur to Delchey Tukla Fulak District Plan
Providing and fixing solar water heater of approved brand as per approved by engineer inchage all fitting and carraige complete job
Remaining work of Electrification of station/service buildings, cover over platform, circulating area & approach road of stations and colony area, quarters provision of pumps and other work at Nagod, Phulwari, Devendra Nagar, Sakariya, Panna, Barkheda, Surajpur & Sabdua station and Supply, Installation, testing & commissioning of 33/11/.440 KV Substations with New Electrical connection at stations related with Satna - Panna - Khajuraho new BG Rail line project of Jabalpur division of West-Central Railway.
ERECTION Drilling of horizontal bore below Metre track by pushing method for laying of RCC/DWP pipe upto 450 mm dia. Total 2125340.00 Supply, erection, testing and commissioning of all in one solar street light 24W 24AH life PO4 60Wp- Item- 30 PVR S No. Item Description of Item Unit Qty Rate Amount No
8808/E8- REPAIR / MAINT/ REPLACEMENT STREET LIGHTS, PERIMETER LIGHTS, GARDEN LIGHTS, DECORATIVE LIGHTS AND CONNECTED WORKS AT NTS TEYLERABAD, MARCOS, NAD/DAD/CHOULDHARI PUMP HOUSE, FILTRATION PLANT, INS UTKROSH, RUNWAY PERIPHERY AND VAYU VIHAR AND
Taking down and dismantling of existing pole mounted luminaires of any types (Garden lights,high mast light,Flood lights,Gate lights,Street lights,Decorative lights,Solar lights,post top lanten) including disconnection and cleaning corrosion to all spares (bolts,clamps,brackests) with preventing to rapid rusting treatment.replace a LED drivers for maintaining to IP 66 rating integrity,external surge protection devices for over- voltage protection. and suitable size of LED module board, terminal blocks, flexible wires,UV stabilized covers for specific luminaire models etc complete all as specified and as directed by Engr-in-Charge.