Loading…
Loading…
1,430 results • Best match
Develop.of 6L UER2 NH 344 M NH1 Km0.700 to Dwarka Sec24 Road Km38.111 in Delhi n 4L RS NH344 N NH344 M Delhi at Km26.135 of NH344 M UERII till BHD byp of NH10 near BHD in HR pkgI 2 3 NH344M n 5 NH344N 2 call Works at RnC of EPC Contractor
23 Solar Power System
CONSTRUCTION OF 6 BEDDED PRIMARY HEALTH CENTRE (H TYPE) AT KOTHDODDI VILLAGE, DEVDURGA TALUK, RAICHUR DISTRICT.
Supplying, installation, testing and commissioning of solar hot water heater comprising of solar Flat Plate Collector (FPC) of size 2120x1040x100mm and stainless steel hot water storage tank with stai...
CONSTRUCTION OF (SC) PRE METRIC BOYS HOSTEL AT CHITTAPURA TOWN, CHITTAPURA TALUK, KALABURAGI DIST.
Supplying, installation ,testing and commissioning of solar hot water heater comprising of solar flat plate collector of size 2120x1040x100mm and stainless steel hot water storage tank with stainless ...
REPAIR REPLACEMENT OF INTERNAL UNSERVICEABLE POINT WIRING FITTING FIXTURE AND CONNECTED ACCESSORIES WORK IN SECTOR II UNDER AGE EM IV OF GE (SOUTH) BATHINDA AT BATHINDA MIL STN
S&F in replacement thermostat ISI marked stem type 240 Volts, AC supply temp range at least 30 to 75 degree C for geyser/solar water heater system complete all as specified an directed
Construction of infrastructure of Tactical Head Quarter (THQ) at the camp of 13th Bn ITBP at Mangan Distt. of North Sikkim at an altitude of 15010 feet and a distance of 200 Km from Distt. Mangan and 280 Km from Gangtok. Camp connected by road.
Supplying, installation, Testing & Commissioning of the integrated type solar PV lighting system on the existing pole structure, comprising of 30 watt, 6V Mono Passivated Emitter and Rear Contact (PERC) Solar Panel (minimum efficiency 21%), Pulse with modulation (PWM)/Maximum Power point tracking (MPPT) charge Controller in the box with a sleek appearance and a sturdy structure, is weather-proof, and is simple to install, With Lithium- Iron Phosphate Battery (LiFePO4) 3.2Volt (Cell) 30 AH battery, charging time 8- 10 hours, Battery backup time 12 hours (minimum), LED fixture watt 30 watt, Input voltage: 12V DC , Operating temp range -15 deg to 50 deg centigrade, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5,Driver efficiency >85%,THD 10% as per IEC 61000-3-2 , P. F.≥0.95, IP-66,IK-08, CRI >80 , under voltage and over voltage protection, Electro Magnetic Interference (EMI) Electro Magnetic Compatibility (EMC) As per CISPER 15 A, lenses for beam angle as per Illuminating Engineering Society of North America (IESNA) type I/II/III as per the width of the road and the project requirement, Correlated Colour Temperature (CCT) 5700°K /6000°K (As per American National Standard Institute (ANSI Bin)) , life time (LED,Driver & electrical circuitry) of 50K hours lamp burring hours till the 70 % of initial Lumen maintained as per LM80 extrapolation IES TM-21-11 report, automatic switch on/off, Alliuminium or Acrylonitrile Butadiene Styrene (ABS body), can be installed on a pole or wall. System lumen efficacy >120 lm/Watt output All as per pre approved by Engineer in-charge complete in all respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required.(Part 1), for fixtures up to 60 watt. LED light Complete with mounting structure for the battery and accessories and wind storm withstand capacity as per the zone. (Thermal management: heat sink of aluminium housing such that LED junction temperature do'nt rise aboven 90°C) 30 Watt (System lumen efficacy >120 lm/Watt)
CA NO. GE AF NO.1 / GUR-33 / 2026-27 REPAIR TO LEAKAGE/ SEEPAGE SUNKEN FROM WALL,SHAFTS REPAIR WORK AND OTHER CONNECTED WORKS IN AIRMEN MESS, SNCOS MESS, DESC LINE, DSC MD ACCN, MADHUR MILAN, OFFRS MESS AND OFFRS LIVING ACCN AREA OF 13 BRD , 16 BRD
Taking down existing bitumen felt roof tretment including padding,cement mortar bedding,grass, trees treating with chemical and cleaning the surface and removal outside the MOD land as per NGT norms, complete all as specified and directed Note- Taking down earthng strips and solar panel wires from roof and re-fixing on the same position after APP laying is deemed to be inclusive of rate quoted by the contractor