Loading…
Loading…
16,184 results • Best match
Installation of 4 nos 18W Solar street light at Bairampur Uttar para part No 96/21 under Bairampur GP of Bongaon Block.Proposal ID APAS/01/096/21/0006
eProcurement System of Government of West Bengal Created By: SAMIR MONDAL Created Date/Time: 15-Jan-2026 01:04 PM Tender Title: Installation of 4 nos 18W Solar street light at Bairampur Uttar para part No 96/21 under Bairampur GP of Bongaon Block.Proposal ID APAS/01/096/21/0006 Tender ID: 2025_ZPHD_969495_19
WB/HOW/SHY-II/NIT-20/2025-26
INSTALLATION OF SOLAR STREET LIGHT FROM KALYANI BATTALA BHAKTI RANI MAITY TO ALOK PRAMANIK 'S HOUSE SCHEME ID- APAS/01/179/166/0006
Installation of Solar Pump at Chandi Mela at Ghonga Village
eProcurement System of Government of West Bengal Created By: BIRENDRA NATH MAHATO Created Date/Time: 21-Dec-2025 07:33 PM Tender Title: Installation of Solar Pump at Chandi Mela at Ghonga Village Tender ID: 2025_DM_916514_7
Installation of Solar Street Light (MINI) (with 6mtr. G.I. POLE and 1 No.18 WATT LED Street Light) FROM Uttar Baliya Monsa Mandir to Tapas Mondal House FOR A P A S CAMPAIGN WARD-1 BOOTH NO 157 under Rajpur Sonarpur Municipality within Sonarpur utta
Stand Alone Solar PV Street Lighting System (18W LED Light) a. 6 meter G.I. Pole b. 1x 100 wp Si PV Module c. 1x 42 Ah 12.8V Lithium Ferro Phosphate (LiFePO4) Battery d. 1x 18W LED Luminaries
Installation of Solar Street Light (MINI) (with 6mtr. G.I. POLE and 1 No.18 WATT LED Street Light) at KC Karmakar Goli, Pradip Kundu Goli, Manas Pal Goli FOR A P A S CAMPAIGN WARD-1 BOOTHNO 242 under Rajpur Sonarpur Municipality within Sonarpur
Stand Alone Solar PV Street Lighting System (18W LED Light) a. 6 meter G.I. Pole b. 1x 100 wp Si PV Module c. 1x 42 Ah 12.8V Lithium Ferro Phosphate (LiFePO4) Battery d. 1x 18W LED Luminaries
Installation of Solar panel with drinking water facility at Haribhanga Under Mahua Gram panchayat
Febrication of MS structre with base plate and fustnut / jumpnut on the base and Installation of Solar photovaltatic array Panels on the structure as per standard & approved drawing. The Solar Panels will then be connected to the Pump, Controller which in turn will be connected to the pump as well as the level indicator of the water tank as per direction of the E.I.C. (LMR)