Loading…
Loading…
742 results • Best match
Construction of 11/0.4 kV substation, capacity enhancement of 11/0.4 substation, 33 and 11 kV VCB and other works under EDD II Loni
Erection of Single pole with 8.5/9 Mtr Long. PCC Pole by digging suitable pits in hard/soft soil/ rock and its back filling including concreting and grouting of pols and fixing of all accessories . Work shall be done as per respo specification. Grouting meterial to be provided by bidder with cartage from store to site.
Construction of cover parking facility for vehicles at 220kV Substation HVPNL Daultabad
Operation And Maintenance Of Substation - SCADA integration work and all other Associated work at 132KV Sub Station Aligarh- (v) under ETD-I, Aligarh
Operation And Maintenance Of Substation - SCADA integration work and all other Associated work at 132KV Sub Station Aligarh- (v) under ETD-I
Establishing 2x12.5 MVA, 66/11KV Sub-Station at Kalathmadu along with construction of proposed 66kv LILO line from the existing 66kv Virajapete- Ponnampete SC line on DC towers to Proposed 66/11kV sub station at Kalathmadu for a distance of 1.925km ... and erection (including ...
SF6 Gas (40% of total gas Qty. of each Sub-Station) Sub-Station
CONSTRUCTION OF ADDITIONAL 5MVA FOR 33/11KV SUBSTATION BADALAPUR JAUNPUR AND INCREASING CAPACITY OF 33/11KV SUBSTATION SIDA SATHARIYA FROM (2X5) MVA TO (2X10) MVA, DISTT. JAUNPUR ON SEMI TURNKEY BASIS.
Earthing of S/s outdoor equipments: Laying of earth mat in the switchyard by laying of M.S. round of 32 mm dia in 1000 mm deep trenches with M.S. round 32mm dia, 3 Mtr. long earth electrodes as per RESPO/approved SOP drawing. The work includes welding of the M.S. round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6 mm as per item below (All required materials will be provided by contractor)(A) Excavation of earth/trenches 1000 mm deep from FGL level for laying MS earth mat (32 mm dia MS round rod).(B) Laying of 32 mm dia MS round earth rod horizontally in 1000 mm deep trenches at every 3 mtr lengthwise and every 3 mtr widgthwise throughout the switchyard.(C) At the level of 1000 mm deep trenches, at each cross joint of horizontally laid MS earth mat, bury 3 mtr long 32 mm dia MS round earth rod vertically in the ground and properly shape and weld each joint. The works includes cutting, shaping and binding, preparation of joints, proper making and welding of main earth mat bar joints and applying bitumen, bitumen impregnated on joints U clamp i.e. end joints, cross joints, lap joints etc).(D) To weld riser GI strip of 50x6 mm from main horizontal earth mat as per leg of each switchyard structures and to weld riser strip from two different locations (top & bottom) on the leg of the structures of each equipments like Transformer, Terminal gantry, Bus-bar gantry, Post insulator, 33 kV CT, 33 kV PT, Line & Bus isolator etc.
Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Electricity Substation; Power House Equipment; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - Electricity Substation; Power House Equipment; Service Provider