Loading…
Loading…
732 results • Best match
Construction of Boundary wall (200m) and other Civil Works at 33/11 KV Substation Bhikkawala Distt. Bijnor.
Earth filling under floors and/or sub station area including cost of earth when obtained from with in 8 km outside UPPCL area including its roylty and carriage, loading/ unloading, spreading , watering, ramming in 20 cm layers and dressing of earth etc. for proper completion of the work. SOR-2023 CSI No. 4.10
Construction of Boundary wall (100m) and other Civil Works at 33/11 KV Substation Maniyawala Distt. Bijnor.
Earth filling under floors and/or sub station area including cost of earth when obtained from with in 8 km outside UPPCL area including its roylty and carriage, loading/ unloading, spreading , watering, ramming in 20 cm layers and dressing of earth etc. for proper completion of the work. SOR-2023 CSI No. 4.10
Construction of Control Room Building and other Civil works for New 33/11KV substation Manauta Distt. Bijnor.
Pre-Construction anti-termite treatment, by creating a barrier under and around the columns pits, foundation trenches, under floors, junctions of Walls & floors, around the external perimetre of building, expansion joints, surrounding of pipes and conduits etc. (Plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981))with Eldrine emulsifiable 0.2% concentration or any other approved material such as Heptachlore or chlordance will be used. The consumption of emulsion shall be (i) Foundation and masonary @ 5 Ltrs/Sqm, (ii) Back fills in immediate contact of foundation@ 7.5 Ltrs. / Sqm, (iii) Top surface of Plinth filling @ 5 Ltrs / Sqm, ( iv) Junction of walls & floors @ 7.5 Ltrs / Sqm, (v) Soil along external perimetre of building @ 7.5 Ltrs / Sqm (vi) under apron of the building @ 5 Ltrs. /Sqm. The rates includes cost of all materials, labour, equipments, T&P complete. SOR -2023 CSI 17.01
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Maintenance works and Deployment of Manpower for O and M of various 400 KV 220 KV and 132 KV SubStations under ETC Muzaffarnagar; Substation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Maintenance works and Deployment of Manpower for O and M of various 400 KV 220 KV and 132 KV SubStations under ETC Muzaffarnagar; Substation; Service Provider
FOR MAINTENANCE OF NITROGEN INJECTION FIRE PROTECTION SYSTEM (NIFPS) SERGI MAKE OF 02NOS. 160MVA T/F AT 220KV SUBSTATION SAIFAI UNDER ETD-ETAWAH.
Hot Line Water Washing of (Four Cycles) 220 KV Switchyard-2 at PTPS, Panipat, 220 KV Switchyard at DCRTPP, Yamuna Nagar and 400 KV Switchyard at RGTPP, Khedar Hisar.
400 KV Switchyard at RGTPP Khedar Hisar (11 Bays) as per detailed scope of work at Sr. No. A of Annexure-III for Option-I (Hot Line Washing Machine arranged by the Firm)