Loading…
Loading…
749 results • Best match
Design, Engineering, Supply & Procurement, Civil Construction, Erection, Testing, Commissioning and Taking over of the complete BESS project rated for 20MW/120MWh at the point of injection (132kV GIPCL substation) of Gujarat Industries Power Company Limited
c / Modification of Existing 132 kV Switchyard, HT System, Communication LS 1 ₹ - ₹ - ₹ - ₹ - ₹ -
Work of construction new 11 KV line due to overloading of 11 KV Cold feeder emanating from 33/11 kv substation Bahadurpur under EDD Kannauj in Business Plan Scheme 2026-27.
Following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.
Construction of Damaged 33 KV UG SC Line of 33 11 KV Substation Line from Maruti Showroom to Exposure as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Construction of permanent concrete coal transportation road from Kalimandir chhak to weighbridge no-6 inside Handidhua Coal stock and field substation to weighbridge no.8 ramp of Ananta OCP under Jagannath Area.
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
33KV SWITCHYARD AND 11KV SWITCHGEAR WORK IN BP 2026-27 UNDER EUDD 33KV STADIUM AND YEIDA
Providing of following material of standard make / best quality for complete the work of 33 KV Switchyard & 11 KV Switchgears work with disconnecting & reconnection of cable etc. as per RESSPO norms by the contractor at his own cost : -
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling Sump pump; Switchyard; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Overhauling Sump pump; Switchyard; Service Provider