Loading…
Loading…
2,265 results • Best match
QUANTUM OF WORK schedule of maintenance and attending breakdown 33/11/0.4 KV line of 33/11 KV Substation Auras and Miyaganj, EDSD-III, Miyaganj under the area of Electricity Distribution Division-V, Hasanganj, Unnao.
Carriage loading and unloading of PCC/ ST Poole from ESC store Unnao/Sub Station Store/ other site to site work as per required and vice versa.
CLEANING AND LEVELING OF SWITCHYARD OUTSIDE AREA AT 132 KV S/S NAUGARH
Excavation of roots of the tree which was already cutted during extention of 132KV Switcyard and remove them from switchyard and back filling and levelling of excavated place of switchyard. The work also includes removing the big stone outside switchyard of 132KV Substation Naugarh. All men and backhoe loaders will be provided by firm to complete the job in all respect.
Cement Concreting of 11 KV/ 132 KV outdoor switchyard of USHP-I, Sumbal
Repairing of drain within switchyard area at 400KV and 220KV at SgTPP, WBPDCL.
Development of area for works of BESS PLANT near Switchyard of NTPC BarhSTPP
Repair of 200KVA Distribution Transformer and Switchyard of Workshop Complex,Dowlaiswaram, ONGC Rajahmundry
b. Repair/maintenance of 11KV/433V Switch yard: 1. Removing of existing paint/dust of double pole structure of switchyard of 11KV/433V substation by emery/buffing process. 2. Supply and painting of Red Oxide/Zinc oxide paint (2 Coats) for complete double pole structure. 3. Supply and painting of Silver paint (2 Coats) conforming to IS Standards for the complete double pole structure. 4. Repair of Air Break Switch wherever required for smooth operation. 5. Supply and installation of suitable capacity lightning arrestors of required quantity. 6. Repair/maintenance/replacement of any other item such as ACSR conductors, Insulators, nuts, bolts, washers and earth strips etc. of DP structure wherever required. 7. Any other repair/maintenance/replacement not mentioned in the scope but needs to do for a complete finish of DP structure. 8. Removal of existing barbed wire of the fencing structure. 9. Supply and installation of barbed wire of required quantity on the fencing structure. 10. Removing of existing paint/dust of fencing structure of switchyard of 11KV/433V substation by emery/buffing process. 11. Supply and painting of Red Oxide/Zinc oxide paint (2 Coats) for complete fencing structure. 12. Supply and painting of Silver paint (2 Coats) conforming to IS Standards for the complete fencing structure.