Loading…
Loading…
1,874 results • Latest
CONSTRUCTION OF BADMINTON COURT AT TAPKARA
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
RFID Library Automation with Digital Library System
Charges for Annual Maintenance with OEM Support
AMC for Update, Maintenance and Support of LANTEK NESTING software Package for BHEL-HPVP, Visakhapatnam for a period of one year
AMC for Update, Maintenance and Support of LANTEK NESTING software Package for M/s. BHEL-HPVP, Visakhapatnam for a period of one year - Reg
PROPOSED GYM & FITNESS CENTER AT CHORVAD, DIST. JUNAGADH
complete including maintenance for 3 years with
Construction of RCC ESR, RCC UGR, Sunken Pump House, CC Road, Boundary Wall, Laying of CWRM, Distribution Pipeline, Pumping Arrangement, External and Internal Electrification, Automation Works
Supplying, Fitting,fixing & Commissioning,of The body PN-16 and cover will be ASTM A536 Ductile lion can be integrated with PLC panel for operation with a minimum pressure in upstream 0.2 kglcm2 to a maximum pressure of 8 kglcm2. The valve seat shall be a solid, one-piece SS-316 desian and shall have a minimum five-degree taper on the se ating surf ace for a positive , drip-tight shut off. The diaphragm assembly shall contain a self-cleaning S5-303 stainless steel stem of sufficient diameter to withstand high hydraulic pressure differentials and shallbe fully guided atits both ends by a bearing in the main valve cover and an integral bearing in the valve seat, in order to be pr actically in balance along its fullift for limiting encessive friction, thus incre asing its ability| to react when performing a correction. The diaphragm shall not be usedias the seating surface and it shall be fully |supported by machined surfaces of the valve body or cover in its closed or opened position. In operating position, its inactive surface shall be completely supported for securing its maximum longevity. The control willbe achieved by, operating 2 number Solenoid Valves mounted on the main Valve. The Connecting tubing on the Main Valve willbe SS with |SS fiting from reputed companies makes. The flexible tubing on Main valves will not be allowed. of the approved make:(Make- KROHNE/ MARSHAL/ LIE & HIABBI/ SIEMENS/Equivalent make with approval of authority) to control water supply, including cost of material with alltaxes transporatation to sitelstorage with insurance.
Civil and Electrical SR works, as per detailed NIT, at ESIC Regional Office and Staff Quarters at Nungambakkam, Chennai-600034
Supply and installation of a Roller Slide with a height of 5ft and width of 2ft, featuring a sliding chute of 10ft in length. The rollers will be made of 3mm PVC, supported by 1/2 inch GI pipes, with a total of 46 multicolor rollers used. The slide will be coated with polyurethane (PU) paint for enhanced durability and weather resistance. The required product area for installation is 2.5ft x 14ft, with the play area measuring 6ft x 18ft. The installation includes the cost of rollers, GI pipes, PVC material, PU coating, and the labor for site preparation, assembly, and painting of the structure. The estimate also covers transportation costs for delivering materials to the installation site, ensuring a complete and safe installation of the slide.