1,007 results • Latest
Please refer in BOQ
Providing Consultancy Services Including Survey, Detailed Investigations, Study, Structural Design, Estimation, Preparation of Detailed Project Report & getting checked from DIQC JK/NIT/IIT and vetted from State Technical Agency (STA) and Principal Technical Agencies (PTA) for Bridges having Span more than 15 Mtrs as per latest IRC Codes. (Complete Job). In PMGSY Division Mendhar PMGSY-IV in Jammu Province J&K UT (Complete Job)
Comprehensive Annual Rate Contract for Carrying out Maintenance Activities in Mainline ROW, RCP/MOV Locations under WRPL Chaksu Base Mainline Jurisdiction
(ii) The Corporation shall have the fullest liberty without reference to the Surety Insurer and without affecting in any way the liability of the Surety Insurer under this Surety Bond, at any time and/or from time to time to amend or vary the Contract and/or any of the terms and conditions thereof or relative to the said Initial Security Deposit/Security Deposit or to extend time for performance of the said Contract in whole or part or to postpone for any time and/or from time to time any of the obligations of the Contractor and/or the powers or remedies exercisable by the Corporation against the Contractor and either to enforce or forbear from enforcing any of the terms and conditions of or governing the said Contract or the said Initial Security Deposit/Security Deposit or the securities available to the Corporation or any of them and the Surety Insurer shall not be released from its liability under these presents and the liability of the Surety Insurer hereunder shall remain in full force and effect notwithstanding any exercise by the Corporation of the liberty with reference to any or all the matters aforesaid or by reason of time being given to the Contractor or any other forbearance, act or omission on the part of the Contractor or of any indulgence by the Corporation to the Contractors or of any other act, matter or thing whatsoever which under the law relating to sureties or otherwise which could but for the provision have the effect of releasing the Surety Insurer from its liability hereunder or any part thereof and the Surety Insurer hereby specifically waives any and all contrary rights whatsoever.
Providing and Laying Underground Sewerage Networks in Zones 12-1 and 12-2 and Constructing In-line Pumping Station 12-2-1 at Odiampet in Puducherry
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB and establishing TBMs for the project area as instructed by CMWSSB Engineer. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. While surveying by RTK method, it shall be ensured that the values are captured by “fixed” status. The DGPS RTK survey report including “fixed” or “float” for the coordinates captured and horizontal & vertical precision with raw data in OEM nativity file format like (.mdb, .jxl, .tet, etc) shall be submitted. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N).
05/PWD/ADB/PDY/2025-26. Condition Assessment and Rehabilitation of the old Sewerage system at Muthialpet in Puducherry
Topographical survey to detemine sewer alignment including GL, IL connection sewer/laterals levels MH positions, tracing of buried manholes along alignment, proximity of structures, measurements of exact length between manholes & submission of detailed report and drawings in approved fomat in three sets of hard copy and one set of soft Copy (Before and after execution)
Providing and Laying Underground Sewerage Networks in Zones 13-5 and 14-3 and Constructing In-line Pumping Stations 13-5-1,14-3 1,14-3-2 and 14-3-3 at Thengaithittu and Ariyankuppam in Puducherry
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB and establishing TBMs for the project area as instructed by CMWSSB Engineer. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. While surveying by RTK method, it shall be ensured that the values are captured by “fixed” status. The DGPS RTK survey report including “fixed” or “float” for the coordinates captured and horizontal & vertical precision with raw data in OEM nativity file format like (.mdb, .jxl, .tet, etc) shall be submitted. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be furnished in (.shp) format. The geo referenced assets and utilities along with the attributes shall be converted into proper geo database (FGDB / PGDB) with the attributes. One set Hard and Soft Copy of all the assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print. For the Underground / Surface Assets along the roads for the distance above 100 km
Providing and Laying Underground Sewerage Networks in Zones 13-Park and 14-2 and Constructing In-line Pumping Stations 13-Park- 6, 13-Park-1 and 14-2-1 at Nainar Mandapam and Murungapakkam in Puducherry
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB and establishing TBMs for the project area as instructed by CMWSSB Engineer. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. While surveying by RTK method, it shall be ensured that the values are captured by “fixed” status. The DGPS RTK survey report including “fixed” or “float” for the coordinates captured and horizontal & vertical precision with raw data in OEM nativity file format like (.mdb, .jxl, .tet, etc) shall be submitted. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N).