Loading…
Loading…
902 results • Best match
ERECTION AND MAINTENANCE OF HT LT & TC UNDER LODHIKA SDN UNDER RRD
Cable/Conductor length. Cable length must be measured before laying.
ERECTION OF HT LT & TC UNDER LODHIKA SDN UNDER RRD (ND SCHEME)
Cable/Conductor length. Cable length must be measured before laying.
MAINTENANCE OF HT LT & TC UNDER LODHIKA SDN UNDER RRD
Cable/Conductor length. Cable length must be measured before laying.
ERECTION OF HT LT & TC UNDER LODHIKA SDN UNDER RRD
Cable/Conductor length. Cable length must be measured before laying.
Bid for Annual Rate Contract for supply of Instruments for Physics, Chemistry and Biology Labs for Birsa Munda Tribal University, Rajpipla
Optical lever (Optical lever, convex lens, Raising Omega/Orbit/PICO/ESAW
Building works/ Building maintenance works with structural steel and Metal Sheet roofing items.
Supplying and fixing following size uPVC UV-Stabilised soil / waste quality pipes and fittings ( SWR ) for soil, waste, vent, anti syphonage, HVAC waste pipe and rain water pipe lines consisting following items of work:- i) Providing and fixing uPVC UV-Stabilised Soil/ waste pipe as per IS:13592 and IS:14735 Type-B laid in floor & on Exposed faces of wall of approved make. ii) Fixing the pipeline vertically by Metal clamps with rubber seal of approved make iii) Fixing the pipeline Horizontaly with specified slope below the ceiling by Metal clamps with rubber seal and GI hanger rods not less than 5mm dia at specified spacing, including all required hardware. iv) Providing and fixing uPVC cowl at the top of soil, waste water & vent pipe line. v) Providing and fixing uPVC P/S trap on line as per requirement for soil,waste water pipeline. vi) Laying the pipe below floor / ground to the slope and gradient equal to (or) steeper than 1 in 50, making leak proof connections of soil /waste pipe line from the shaft with inspection chamber / Manhole / Gully trap Chamber including the cost of filling around the holes of inspection chamber / Manhole / Gully trap with cement mortar 1:1 mixed with water proofing compound vii) Jointing the pipe / fittings with Solvent Cement & Rubber ring gasket with making holes in walls / floor grooving and redoing the same and brick support etc. Carrying out water-tightness test for the pipes laid as per codal provisions. Providing Ring Joint pipes at verticals and solvent cement jointed pipes at concealed locations. viii) Cutting the pipe to the required length including providing short pieces, necessary connectors, fittings & specials with & without door, assorted fittings such as plugs, tees, couplers, reducers, cross tees, reducing tees, elbows, bends, single & double Y, vent cowl, gaskets, offsets etc. including providing necessary clean outs, cleaning pipe, extension pipe if any for clean outs, door bend, door elbow, door Y, socket plug, etc wherever required for accessing every segment of soil and waste pipes to enable removal of any Chock up after installation. ix) Providing necessary specials for connecting UPVC SWR (IS:13592/ IS:14735) pipe with UPVC (IS:4985) pipe etc x) Dewatering the pit/ trenches if necessary till completion of work xi) Testing the pipe line for any leakages, rectifying the leakages if any, retesting etc., till water tightness of the pipe line is ensured. xii) Exposed pipe fixing arrangement include slotted G.I. section and U clamps. Note: Earthwork excavation for trenches shall be paid under relevant items For Soil & waste, Vent and Rain water pipe lines