FOR INSTALLATION, COMMISSIONING AND TESTING OF SYSTEM PROTECTION SCHEME (SPS) AND SUPPLY OF MISC. MATERIALS ALONGWITH OTHER ASSOCIATED WORK AT 400 KV SUB STATION PANKI KANPUR
Laying and termination of digital input cable (6cx2.5 mm2 armoured copper control cable) including all consumables required to complete the work to PLC for main Breaker status of ICT-I, ICT-II, 220 KV Chhibramau, RPH, Bithoor, Raniya and 132 KV Dibiyapur, Azad Nagar- I&II, Dada Nagar. Cable will be provided by department.
ERECTION AND COMMISSIONING OF 63 MVA TRANSFORMER AT 132 KV S/S AZADNAGAR UNDER ETD-I KANPUR
Termination work both side of power cable (size 3.5x95 sq mm) and control cable for above 02 Nos. AC cubical box as per site requirement with punching proper size of Aluminium lugs of dowell/Jackson make (lugs will be provided by contractor) and earthing work of above AC cubicle box with MS flat as per site requirement. . The job including laying of control cable different equipment light, T/F fan, compressers, C.B's etc. from 2 Nos. AC cubicle box) and all other associated works to complete the job (control cable & MS flat provided by department).
03/ETC-II(P)/2026-2027
Laying of control cable from C&R Panel, RTCC panel to Transformer Marshaling box, D/M Box, CT, PT, Isolator etc. as per site requirement. Job includes preparing cable schedule, Dressing, binding and Termination of cable, fixing of cable tray, support structure and termination of cable, marking and its ferruling as per schedule, inter connection with C&R panel, CT, PT, Isolators etc. as per site requirement for completion of job satisfactorily.
Augmentation work
11KV Cable Terminating Structure for LV Side of Transformer(0.072 t Per Structure)
Augmentation work
11KV Cable Terminating Structure (0.069+0.003=0.072 t Per Structure) 03 Nos
Attached
RCC Cable trench (1:2:4) including excavation and disposal of un-wanted soil. for laying of 11 KV XLPE Power Cable and control cable from power transformer, VCB and other equipments to control room and for outgoing cables from control room to outgoing structures including cable duct covers (cable duct covers should be covered with Angle Frames using angle 45x45x5 mm and 8 mm Tar Steel @ 200 c/c & M-20 Concrete) including necessary form work