Loading…
Loading…
3,201 results • Best match
Switch 8 Port With 2 SFU, IO Box, 4U Network Rack, 6U Network Rack, 24 Port Switch With 4 SFU, Cat 6 Dual Jacket, SFP Module, Fiber Patch Cord LC Lc, Fiber Optical Cable 12 Core, Patch Cord 1 Mtr, Fiber Switch 24 Port, Patch Cord 24 Port, Splicing ... Machine, Casing Bit, ... Bit, Installation and ...
Fiber Optical Cable 12 Core
CAT6 UTP Cable, CAT6 SFTP Cable, PVC Casing Capping, CAT6 1 Mtr Patch Cord, CAT6 0.5 Mtr Patch Cord, RJ45 Input Output Box with Face Plate, 24 Port Patch Panel, OFC Single Mode Patch Cord LC LC, 6 Core Single Mode Optical Fiber Cable, 6 Port LIU, 600 ... Point, WiFi Controller, ... Controller, Installation Configuration ... of wifi system
6 Core Single Mode Optical Fiber Cable
Laying of U/G Optical Fiber Cable and associated works in BA Jammu-Vijay chowk-IIT Jammu-llM Jammu
8 MP intelligent varifocal network camera, 4 MP 32X IR network dome camera, 64 channel network video recorder, Joystick for PTZ camera control, 8 TB surveillance hard drive, 8 port web managed smart POE switch, L3 switch 16 port, 1000 Base LX SFP ... HDMI cable 4K, ... UTP cable outdoor ... outdoor cable , ... UTP cable unarmoured, ... unarmoured, OFC cable ... OFC cable 12F ... meter, Optical fibre ... Optical fibre cable ... fibre cable joint ... closure, Fiber drawer ... copper cable 90 ... copper cable , ... 76mm, Optic fibre ... Optic fibre cable ... fibre cable clamp, ... clamp, OFC cable ... OFC cable bracket, ... inches, Installation and ... system, Laying of ... of OFC cable, ... OFC cable , ... cable, Laying of ... Cat cable , ... pole, Laying of
Optical fibre cable joint closure As per ATC
Providing and Laying cement concrete pavement from RD 0/800.50 to 1/045 along with drain ( Kakira Bazar).
Cement Concrete Pavement construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (grade), coarse and fine aggregate conforming to IS:383 , maximum size of coarse aggregate bot exceeding 25mm , mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion , construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specifications.and as per direction of Engineer-In-Charge including carriage of materails with in all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
MOEI and Fans in office bldg campus lighting RMO S-Stn DG Set VRV VRF system, pumps, FAS and CAMC for CCTV system installed at CEC, Patiala SH SITC of Post Top light and laying of OFC cable in campus premises Subwork/Packages: SITC of Post Top light ... and laying of ... of OFC cable ... OFC cable in ... campus OFC cable ... OFC cable in