Loading…
Loading…
3,160 results • Best match
To establish 8.4 Gbps bifurcated 1 IS TO 1 uncompressed and unshared, Symmetric Internet bandwidth via Leased Line Last mile connectivity through redundant Optical Fiber Cable at 270 Nodes of CCL command areas As per Annexure I for a Period of 05 YR
1 Gbps Bandwidth Required at System department, CCL(HQ) including necessary hardware & Software with the Integration to LAN
Optical Fibre Cable (OFC) laying / construction work in Ranchi Operation Area
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - Laying down of new Optical Fiber Cable; Laying down of new Optical Fiber Cable
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - Laying down of new Optical Fiber Cable; Laying down of new Optical Fiber Cable
Optical Fibre Cable (OFC) laying construction work in Jamshedpur Business Area (BA).
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) laying construction work in Hazaribagh Operation Area (OA)
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) laying construction work in Dumka Operation Area (OA).
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).