Loading…
Loading…
3,180 results • Best match
Laying of PLB pipes, duct, excavation of trenches, HDD, optical fibre cable blowing, pulling and splicing works etc in the routes as specified in NIT, for Nagercoil BA.
Laying PLB pipes/duct, excavation of trenches / HDD, optical fibre cable blowing/pulling and splicing works etc in routes mentioned in NIT for Nagercoil BA.
Optical Fibre Cable (OFC) Patch work Rehabilitation of OFC routes in Dhanbad Business Area.
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) Patch work Rehabilitation of OFC routes in Jamshedpur Business Area.
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) Patch work Rehabilitation of OFC routes in Hazaribagh Operation Area
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) Patch work Rehabilitation of OFC routes in Ranchi Operation Area.
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) Patch work Rehabilitation of OFC routes in Daltonganj Operation Area
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).