Loading…
Loading…
1,049 results • Best match
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 5052.68 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 60.304 km to 71.505 km through UGPL.
1 Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5052.68 Ha of Salandi Left Main Canal from RD 60.304 km to 71.505 km including submission of Report. itemH1Code1 1 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Appointment of Third-Party Inspection Agency (TPIA) for Construction of Distribution system for 5177.98 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 59.970 km to 60.304 km through UGPL
1 Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5177.98 Ha of Salandi Left Main Canal from RD 59.970 km to 60.304 km including submission of Report. itemH1Code1 1 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 5765.34 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 71.505 km to 73.003 km through UGPL
Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 5765.34 Ha. of Salandi Left Main Canal from RD 71.505 km to 73.003 Km including submission of Report.
APPOINTMENT OF THIRD-PARTY INSPECTION AGENCY (TPIA) FOR Construction of Distribution system for 4924.04 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 49.810 km to 59.970 km through UGPL
1 Consultancy charges for QC/QA Planning& getting approval from CCE, Anandapur Barrage Project, inspecting factory & checking the process of manufacturing, getting required quality of material & equipment at Pre-dispatch stage, checking of materials & equipments delivered by the EPC contractor at site/store including site inspection and checking of material and equipment’s used as per design & specification approved by the Chief Construction Engineer, ABP and submitting the final report of canal network and CAD work for 4924.04 Ha of Salandi Left Main Canal from RD 49.810 km to 59.970 km including submission of Report. itemH1Code1 1 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Hiring of Third-Party Inspection Agency - Oil and Gas; 5 yearly Periodic Statuary Testing of 7 nos of LPG Underground Storage Tanks and pipelines along with replacement of CP system of 6 nos of LPG Underground Storage Tanks at 6 ALDSs under RSO; PESO..
Hiring of Third-Party Inspection Agency - Oil and Gas; 5 yearly Periodic Statuary Testing of 7 nos of LPG Underground Storage Tanks and pipelines along with replacement of CP system of 6 nos of LPG Underground Storage Tanks at 6 ALDSs under RSO; PESO..
Hiring of Third-Party Inspection Agency - Deputation of Lead Engineers (Mechanical) at ITPS during Unit 1 R and M and Unit 4 Boiler AOH; Deputation of Lead Engineers (Mechanical) at ITPS during Unit 1 R and M and Unit 4 Boiler AOH; Deputation of Lead..
Hiring of Third-Party Inspection Agency - Deputation of Lead Engineers (Mechanical) at ITPS during Unit 1 R and M and Unit 4 Boiler AOH; Deputation of Lead Engineers (Mechanical) at ITPS during Unit 1 R and M and Unit 4 Boiler AOH; Deputation of Lead..