Loading…
Loading…
528 results • Best match
TGGENCO-CETD- Supply of certain consumables of flash point test kit, Interfacial tensiometer required in Transformer Oil testing Lab/CETD/TGGENCO for the year 2026-27
Contact Resistance meters (Q3), Transformer Winding Resistance Meter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Transformer Winding Resistance Meter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SUPPLY OF TRANSFORMERS FOR ISTS/ InSTS CONNECTED RE PROJECTS AT VARIOUS LOCATIONS ACROSS INDIA
Group A- Power transformers Package including Supply, Transportation, and Site Supervision, complete in all respects as per Technical Specifications
EPOXY TERMINAL PLATE WITH 160MM DIA, 135MM PCD AND 6 HOLES OF 14MM DIA, 240V, 5A MERCURY SWITCHES FOR MOLG OF M/s. TELK MAKE 210MVA GENERATOR TRANSFORMER
240V, 5A MERCURY SWITCHES FOR MOLG OF M/s. TELK MAKE 210MVA GENERATOR TRANSFORMER
25 KV AC MEMU Transformer 1050 KVA with HV Turret and Accessories complete conforming to RDSO SPEC.No. RDSO/PE/SPEC/EMU/0137 REV 0 (for conventional MEMU DMC)
Description :25 KV AC MEMU Transformer 1050 KVA with HV Turret and Accessories complete conforming to RDSO SPEC.No. RDSO/PE/SPEC/EMU/0137 REV 0 (for conventional MEMU DMC) [ Warranty Period: 30 Months after the date of delivery ] ] Consignee DY,CME/DW/KGP, SER West Bengal 5.00 Numbers Inspection Details Stage Inspection Not Required
Procurement of Various Testing Equipments used for Transformers, Protection Relays, and Circuit Breakers of unit 1 and 2 KATPP, Jhalawar
Various Testing Equipments for Transformers, Protection Relays, and Circuit Breakers