Loading…
Loading…
588 results • Best match
Proc of IT Spares
Transformer UPS
Bearing No. 3205 A of SKF make or 3205 B
Description :Bearing No. 3205 A of SKF make or 3205 BDXL of FAG make Suitable for Bombardier & Medh a EMU rake Transformer oil pump. [ Warranty Period: 30 Months after the date of delivery ] ] Sr.Section Engineer/AUX/MX, Maharashtra 200.00 Numbers Consignee WR
One Drop Instant (Cyanoacrylate) Adhesiv [One Drop Instant (Cyanoacrylate) Adhesive in 20 gm. packing, make: Pidilite Fevikwik 203 or similar. (Note: Self Life should be 9 months from the date of supply.) ]
Description :One Drop Instant (Cyanoacrylate) Adhesive in 20 gm. packing, make: Pidilite Fevikwik 203 or similar. (Note: Self Life should be 9 months from the date of supply.) [ Warranty Period: 12 Months after t he date of delivery ] ] Consignee TRANSFORMER, CR Maharashtra 90.00 Numbers
JP/B862-000-XI-MR-0440/543 - U.P.S. SYSTEM FOR PDH PP PLANT WITH ETHANE AND PROPANE HANDLING FACILITIES PROJECT OF PETRONET LNG LIMITED, DAHEJ (GUJARAT)
7 Fully equipped outgoing feeder (240V SFU 100A with isolation transformer) Unit 1 USD
Electrician trade machinery
THREE PHASE TRANSFORMER, SHELL TYPE OIL COOLED WITH DELTA STAR
30 KV 10 KA LIGHTNING ARRESTOR STATION TYPE
EHV GRADE TRANSFORMER OIL UNDER SPECIFICATION NO. AVVNL/SE(MM)/ E1A8/TN-1274