Loading…
Loading…
573 results • Best match
New Power Transformer 24/31.5 MVA and 11/132 KV and Neutral Grounding Resistance, Two-year Mandatory Spares (1 set), Removal of old transformer, OLTC panel& NGR and Erection, Testing & Commissioning charges for new Tr
New Power Transformer 24/31.5 MVA and 11/132 KV and Neutral Grounding Resistance
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 1600KVA OLTC POWER TRANSFORMER WITH REQUIRED ACCESSORIES ON TURNKEY BASIS AT BEMUL
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 600KVA OLTC POWER TRANSFORMER WITH REQUIRED ACCESSORIES ON TURNKEY BASIS AT BEMUL
REPAIR AND TESTING OF 33/11 KV DAMAGED POWER TRANSFORMERS OF ASSORTED RATINGS AGAINST TN- 2111.
33) Labour charges for opening the transformer tank top cover(if required to facilitate maintenance of transformer) after removing required accessories.Including all required T&P Up to 5 MVA transformer.
FOR SUPPLY OF BIS Certified Energy Efficiency Level - 3 (Old)/Level -2 (New), Conventional 11/0.433 KV, 200 KVA, Distribution Transformer
BIS Certified Energy Efficiency Level - 3 (Old)/Level - 2 (New), Conventional 11/0.433 KV, 200 KVA, Distribution Transformer as per technical specification of the tender
FOR SUPPLY OF BIS Certified Energy Efficiency Level - 3 (Old)/Level -2 (New), Conventional 11/0.433 KV, 100 KVA, Distribution Transformer
BIS Certified Energy Efficiency Level - 3 (Old)/Level - 2 (New), Conventional 11/0.433 KV, 100 KVA, Distribution Transformer as per technical specification of the tender
Supply of 1250KVA,33KV/433V,3-phase ,Distribution Transformer for conducting HV test (Forward charging) at Dr. NTTPS