Loading…
Loading…
2,557 results • Best match
Transformer Turns Ratio Test Kit as per annexure for SAPDC Arun Project
Transformer Turns Ratio Test Kit as per annexure for SAPDC Arun Project
Supply and fitting of Heater Element on the Transformer Oil Filter machine
Description :Supply and fitting of Heater Element on the Transformer Oil Filter machine 5000 LPH, 13 For mer of Dia 32mm with top and bottom , Kanthal wire 20Gauge, 4KW, 230V,1Ph Make: ANC/NACH or Similar [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/TRS/BKSC, SER Jharkhand 12.00 Numbers
PROCUREMENT OF EHV GR-II NEW TRANSFORMER OIL THROUGH RATE CONTRACT AWARD
EHV GR-II NEW TRANSFORMER OIL
Supply, Installation, Testing and commissioning of 11KV circuit breaker for 500KVA Transformer
Supply and fitting of Heater Element on the Transformer Oil Filter machine.
Description :Supply and fitting of Heater Element on the Transformer Oil Filter machine 5000 LPH, 13 For mer of Dia 32mm with top and bottom, Kanthal wire 20 Gauge, 4KW, 230V,1Ph Make: ANC/NACH or Similar. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE(D)BKSC, SER Jharkhand 12.00 Numbers
Set of Gasket for Transformer Oil cooling system for 3 phase locos
Description :Set of Gasket for Transformer Oil cooling system for 3 phase locos Material as per CLW Specification No. CLW/ES/3/0142-Alt.G or latest. Set requirement consisting of 5 items as per attached annexure. ] Consignee DIESEL STORES DEPOT/GY, SCR Andhra Pradesh 12.00 Set UVAM Item ref. ( Item Id :- 2100558 - Set of Gasket for WAG9/WAP-7 & WAP-5 Loco. )