Loading…
Loading…
2,659 results • Best match
Sewing machine repair, Lathe machine repair and service, Arc welding transformer, Spot welding machine repair, Pedestal grinder repair, Drill machine repair, Electric wiring par runnig fit, Plastic sheet with fitting 1 mm par sqr fit, Wall PVC Pannel with fitting par sqr fit, Blue sine board 10x2 fit with fitting, Boarder painting and writing work at room, Sater door repair, Wooden door with fitting 6x3 5 par pcs
Arc welding transformer
Set of Metallic pipe for 3-Phase Loco Main Transformer as per CLW Spec. No.- CLW/ES/3/0253 Alt. S or latest, each set consisting of (1) Pipe-A- Qty. 01 No (2) Pipe- B- Qty. 01 No (3) Pipe- B1- Qty. 01 No (4) Pipe- C- Qty. 01 No (5) Pipe- D- Qty. 01 No (6)Pipe- F- Qty . 01 No (7) Pipe- G-Qty. 01 No.
Description :Set of Metallic pipe for 3-Phase Loco Main Transformer as per CLW Spec. No.-CLW/ES/3/
LIMIT SWITCH ASSYCW_CCW, LIMIT SWITCH ASSYS1_S2_S3_S4, CPS 5 CONTACTLESS POSITION SENSOR, DCM 3 DIGITAL CONTROL MODULE 4 20 MA, FUSE FOR DCM 37 AMP125 VAC FAST ACTING PACK OF 5, GASKET REPLACEMENT KIT 11 150_160, FUSE 0.75 AMP250V 3AG TIME DELAY PART ... AUTO TRANSFORMER 240_120
AUTO TRANSFORMER 240_120 11 150_160 As per Technical specification sheet
SET OF BRACKETS FOR 60/15/9 KVA TRANSFORMER MOUNTING ON UNDERFRAME FOR LHB EOG COACHES CONSISTING OF THE FOLLOWING (1) LWSCWACEOG 71003 Alt."a" COL I-2 NOS. (2) LWSCWACEOG 71003 Alt."a" COL II-2 NOS. (3) LWSCWACEOG 71003 Alt."a" COL III-4 NOS. NOTE: AT TIME OF SUPPLY THE FIRM SHOULD BE SUBMIT THE MATREIAL TEST REPORT AS PER MATERIAL SPECIFICATION MENTIONED IN THE DRAWING.
Description :SET OF BRACKETS FOR 60/15/9 KVA TRANSFORMER MOUNTING ON UNDERFRAME FOR LHB E OG COACHES CONSISTING OF THE FOLLOWING (1) LWSCWACEOG 71003 Alt."a" COL I-2 NOS. (2) LWSCWA CEOG 71003 Alt."a" COL II-2 NOS. (3) LWSCWACEOG 71003 Alt."a" COL III-4 NOS. NOTE: AT TIME OF SUPPL Y THE FIRM SHOULD BE SUBMIT THE MATREIAL TEST REPORT AS PER MATERIAL SPECIFICATION MENTIONE D IN THE DRAWING. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee SSE/TL/PL, WR Maharashtra 60.00 Set Inspection Details Stage Inspection Not Required
Single Operator AC and DC Arc Welding Transformers GTAW Welding Machine as per IS 6008 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Single Operator AC and DC Arc Welding Transformers GTAW Welding Machine as per IS 6008 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Custom Bid for Services - Receipt Handling Storage Erection Testing Commissioning and handing over of 7Nos of 500MVA 765KV 1Phase Auto Transformers at POWERGRID Khavda Pooling Substation II Similar Category Piping Erection Service
Custom Bid for Services - Receipt Handling Storage Erection Testing Commissioning and handing over of 7Nos of 500MVA 765KV 1Phase Auto Transformers at POWERGRID Khavda Pooling Substation II Similar Category Piping Erection Service