Loading…
Loading…
818 results • Best match
REPAIR AND MAINT OF SECURITY LIGHTS PERIMETER LIGHTS HIGHBAY LIGHTS CABLES JUNCTION AND ALLIED ITEMS IN A A BANAR UNDER GE BANAR
Trimming and cutting of tree branches coming across LT over head line, clearing alround 3m the LT line and disposal of branches/bushes to a distance upto 40/50m and cleaning the site complete all as directed. Note :- (i) Length of span shall be 40 to 45m. (ii) Due care shall be given while trimming/cutting the tree branches that there shall be no damage to over head line conductor/pole. In case, due to any negligence, damage is caused, it shall be made good by the contractor and nothing extra shall be admissible.(iii) Proper shut down will be taken from department and T&P will be provoded by conractor.
CA NO. GE AF NO.1 / GUR-60 / 2026-27 REPAIR/REPLACEMENT OF LT UG/OH ELECTRIC DISTRIBUTION NETWORK SYSTEM INCL ALLIED WORKS AND EARTHING PITS IN DOMESTIC AREA AT AF STN GURGAON UNDER GE (AF) GURGAON NO.1
Supply and fixing in replacement LT line separators 1100 V grade PVC spacer to separate LT conductor from each other 5 line as per IS complete as per direction of Engr-in-Charge.
Construction of ABC center and stray dog shelter under TCC limits
c) LT Wiring (From DTC to LT Line Through Merering Box & LT Protection Kit/LT Distribution Box) SINGLE CIRCUIT i) Al Lead Wire - 95 Sqmm ---- stc., including all othe rlead and lift
REMOVAL OF LEAKAGES AND REPAIRING OF VARIOUS SIZE PIPE LINES UNDER SUB DIVISION BHINMAL CITY
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost)
Upgradation of Maruti Estate Crossing to Hanuman Mandir 100 FT Road Development under CM-GRID 3RD CALL
Power Duct Supply & Laying 200 MM PN-6, PE-80, Pressure rating of HDPE pipes - I.S.I. Marked H.D.P.E. Pipes conforming I.S. 4984:2016 (For LT Line)
Upgradation of Itmad-ud-Daullah to Sahadra Chungi Nunihai Road Development under CM-GRID 3RD CALL
Power Duct 315mm OD, PN6, PE80, SDR 17, as per IS:4984. Including coupler Including transport charges Make - DARSHAN (For HT Line & LT Line)