Loading…
Loading…
801 results • Best match
Construction of New PHC at Dakua MPHC in Udalguri district under XV-FC Health Grant under NHM, Assam. TN_11_07
CONSTRUCTION OF 11 KV HT LINE & 63 KVA SUB-STATION SCHEDULE ITEMS:- 13.1 Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle ( 20 mm X 600 mm ), 7/ 4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.
REPAIR/ MAINT OF 33/11KV HT NETWORK FOR DISTRIBUTION TRANSFORMER AT NORTHERN PART OF GARRISION UNDER GE (UTILITIES) UDHAMPUR
M&L for Inspection & Visit the power house for checking the fault occure due to rain, heavy wind and any other breakdown related to 11/33 KV HT line and power house, Rectify the fault at own arrangement and report to JE/Engr in charge after rectifying the fault and proper testing and commissioning of HT line, All minor spare and parts such as nut,bolts,disc and pin insulator, streching of conductor and all other essential accessories required for fault rectification are included in the quoted rates. 16 Each Job 10 Excess(+) Full Conversion INR
REPAIR / MAINTENANCE AND IMPROVEMENT OF HT ELECTRICAL SYSTEM INCL PREVENTIVE MAINTENANCE OF TRANSFORMERS, VCBs, UG CABLES, OH LINES, PANELS AND OTHER CONNECTED ITEMS AT ANARWALA UNDER AGE E/M-II OF GE DEHRADUN
Rectifying the breakdown of all HT/LT/ UG Cable or any other connected equipements with in area / location in under mentioned area due to reasons like falling of tree branches, bird hits, cracking of pin/ disc insulator, breaking over head conductors etc complete including patrolling of LT/ HT line, meggering, removing of fault, replacement of insulator any type, replacement of fuses and restoring the feeder complete all as specified and directed for following areas :- Notes : (a) All T&P & manpower required to complete job is included in unit rate. (b) Unit rates also includes the conveyance & communication facilities required to complete the job. Complaints slip book will issued from the deparment and all the complaint will be written in the slip and to be submitted to the office at the time RAR/Bill for audit purpose.
REPAIR/MAINT AND IMPROVEMENT OF LT DISTRIBUTION NETWORK, LT PANEL, FP BOX AND OTHER ALLIED WORKS IN SECTOR C AND SECTOR D MD ACCN IN ARMY AREA UNDER GE (A) No.1 JODHPUR
Labour only for Re-stringing, restraining ACSR conductor laid over, OH LT line on steel/PCC poles after removing the binding from insulators, lowering the ACSR conductor or broken OH line due to any reason, jointing the broken conductor, Re-winding the ACSR with insulators including providing binding wire, jumpering & connecting the existing service cables after re-stretching/Re-straining to OH line & removing unavoidable sag in the lines, complete all as specified and directed . Note :- 1. Proper shut down will be taken by the authorised rep only. 2. The necessary man power, tool & plant, ledder and JCB/ Veh required for is deemed to incl in the rate quoted for the job.
Construction of 33/11 KV GSS SPZ and Laying of 33 KV line from Existing 33 KV Chambal feeder to proposed 33/11 KV GSS SPZ Bharatpur .
Labour charges for Dismantling of existing electric poles (PCC poles, MS channel, Lattic tower 12.6mtr. , 11 mtr. along with the ACSR Conductors, 11KV/33KV/LT line etc. 11KV insulator LT insulator guard wires, staywires and other electric items of the pole coming along the alignment of the road and removal and re- rolling PCC pole, MS channel different sizes as well as handing over the same to DISCOM store including transportation from site to store and stacking of dismantling material in store and as per the direction of Engineer Incharge and clean the site good as per the requirement and submit the receipt from DISCOM/ concering authority, including all complete works.
Balance Electrical works including Installation Commissioning of 6.3 MVA PTR 33 KV VCB 33 KV isolatorboth HLandLL And Supply installation Commissioningof3 3KVCTLA 33KVSCADA TRFO CR panel including relay and meters RTCC panel 11KVVCB4 panel 11 KV
Survey(Pr&Finl) for HT line upto 33KV