Loading…
Loading…
995 results • Best match
1 Prov. LT line SOP to HP Shiva Project in vill. Jangal Ropa in ES NALT I UESD No. 1 Hamirpur T.S. No. 03/2026-27 (W.B.S. D-26-0136) 2 Prov. LT line SOP to HP Shiva Project in vill. Patyahu in ES NALTI UESD No. 1 Hamirpur T.S. No. 04/2026-27 (W.B.S.
1. Prov. LT line SOP to HP Shiva Project in vill. Jangal Ropa AAAC 7/3.15mm conductor for 3Φ and additional 1% (Sag, Jumpering and wastage} .
Providing and Erecting25 kva Transformer with HT lines At CHOPDA TALUKA 6 WORK
ITEM NO 2:- Supplying and erecting porcelain pin type insulator with GI pin suitable for 11kV line, complete as per specification no. OH-INS/PN
Replacement of damaged PCC Poles and providing GO Switch along with DO fuse unit on Prop. Four pole str. at LIS Pajeena tapping of 11KV HT Line in E Section Chandi under Electrical subdivision, HPSEBL, Darlaghat
"E-Tender for replacement of damaged PCC Poles and providing GO Switch along with DO fuse unit on Prop. Four pole str. at LIS Pajeena tapping of 11KV HT Line in (E) Section Chandi under Electrical sub-division, HPSEBL, Darlaghat. Ch. To.:- Estimate for providing SOP to LIS Scheme Pajneea by providing proposed 63KVA S/Stn., in (E) Section Chandi, under Electrical Sub Division ,HPSEBL, Darlaghat. Complete in all respect. (Item wise Detail attached in Tender document as per Annexure "A" (Supply Part), and Annexure "B" (Erection Part)
Const. of 02 LANE R.O.B. in lieu of LC No. 20-C at Railway K.M. 32/12-14 on DLI-UMB section near Narela Railway Station crossing Akbarpur Barota to Kheri Manajat Road Distt. Sonipat (Pdg. Shifting of 33 KV HT line) Recall
Const. of 02 LANE R.O.B. in lieu of LC No. 20-C at Railway K.M. 3212-14 on DLI-UMB section near Narela Railway Station crossing Akbarpur Barota to Kheri Manajat Road Distt. Sonipat (Pdg. Shifting of 33 KV HT line)
strengthening of LT lines in EDD Afjalgarh/Najibabad Under BP 2026-27
Dismantling of Structures/ Line and received back of the scrap Material from site to ESC Bijnor/ Dhampur with loading & unloading at both ends respectively (as per resspo norms)
Installation of 1x250KVA DTR and Construction of HT line in favour of Sarupathar Railway Station, Sarupathar Dist-Glolaghat under Sarupathar ESD of Golaghat EC
Installation of 1x250KVA DTR and Construction of HT line in favour of Sarupathar Railway Station, Sarupathar Dist. Golaghat under Sarupathar Electrical Sub-Division of Golaghat Electrical Circle.