Loading…
Loading…
1,058 results • Best match
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT LT lines, including cutting looping of tree branches, bush cutting, stay tightening, strengthening straightening of poles, conductor sagging, tightening, UESD Panog
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Ronhat, Panog, Haripurdhar under ESD Panog {Ch. to: R/M of HT/LT Lines under ESD Panog for FY 2026–27}
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV 11 kV HT LT lines, including cutting looping of tree branches, bush cutting, stay tightening, strengthening straightening of poles, conductor sagging, tightening UESd RGH
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Dhamandar, Chandol under ESD Rajgarh {Ch. to: R/M of HT/LT Lines under ESD Rajgarh for FY 2026–27}
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT LT lines, including cutting looping of tree branches, bush cutting, stay tightening, strengthening straightening of poles, conductor sagging, tightening UESD Charna
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Charna, Noheadhar, Bogdhar under ESD Charna {Ch. to: R/M of HT/LT Lines under ESD Charna for FY 2026–27}
Removal of Touchings on LT lines from APRIL 2026 to MARCH 2027 on AMC basis under Malappuram West Section.
REPAIR/ MAINT TO 11KV HT LINES, TRANSFORMERS, GODs, POLES WITH ALLIED WORKS IN AOR OF CPH AND OTHER LOCATIONS UNDER GE (UTILITIES) UDHAMPUR
Material and labour for checking the any type of fault , and other breakdown related to HT line/VCB/RMU and power house ,Rectify the fault at own arrangement complete with proper testing and commissioning of HT line with all spare and parts such as nut ,bolts,disc and pin insulator,streching of conductor and all other essential accessories as required for fault rectification Complete all as specified and directed. Note:- (a) Spares will be measured and paid separately under relevant items. (b) The break down complaint should be attended within 1 hours with the intimation of Engr-in-charge or concern JE E/M by telephonically / verbally. (c) Not attended of complaint after one hours will lead to recovery from subsequent payment in the following manner :- (iii) Not attending within 2 to 4 Hours- Rs. 2000.00 (iv) Not attending within 5 to 8 Hours- Rs. 4000.00 (v) Not attending after 8 Hours - Rs. 10,000.00 (vi) The maximum recovery will be Rs. 50,000.00 plus the expenditure incurred for rectification of the same by any other means.
The Work of strengthening of 33 KV and LT lines Under EDD, Bijnor, Kiratpur, Chandpur and Noorpur.
For 11 KV Line, Single support with 8.5 PCC Poles :- Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of support (pole) complete work as per RESSPO Norms.