Loading…
Loading…
1,018 results • Best match
Detailed drone survey of 66KV transmission lines including AI analytics of captured data to generate reports for predictive and preventive maintenance.
Drone based aerial patrolling and analysis using the AI/ML-based platform for predictive fault detection and health analytics of 20no. transmission lines & assets (Type of lines- HRP orSC on SC or SC on DC or DC on DC or Multi-circuit)
Upgradation of existing 2x20MVA, 66/11KV Hirehalli sub-station to 2x150 MVA, 220/66/11kV GIS sub-station along with construction of associated 220kV transmission line for a distance of 0.805Km, and 66kV Lines for a distance of 46.968Km and laying of 66kV UG Cable for a distance of 1.6Km in Tumakuru taluk & district.
LE3 ii. Conducting Drone survey of Transmission Lines for collection of data along with Aeria linspection of EHV Line Corridor using LIADR method for measurement of Vertical, horizontal and ground clearances of the LT/HT/EHV/ P&T lines, major road/railway/river crossing, building, vegetations etc., which is found to cross or running in parallel with the KPTCL EHV lines and sag measurements and other works. The rates include to collect details such as, • Vegetation growth close to conductor along the width of corridor with measurements • Building/construction violation along the corridor with measurements • Clearance measurement of Roads/Railways. River crossings • Clearance measurement of EHV/Power line crossings (up and down) • Clearance measurements of tower elements (Hang point & Ground point measurement) • Sag measurement of each span of the line all phases • Location of tower (GPS coordinates), type of tower, height of tower, span length and conductor type • Angle of deviation of tower • Submission of detailed consolidated final report for surveying work done appending all the above details including all relevant information collected during survey certificates of the instruments used for the work, photos/videos taken at site and submitting soft copies and hard copy of all documents & reports in 3 sets. Note: 1) The minimum requirement of LiDAR camera is as follows point cloud with RGB mapping Accuracy of +/-25cm ability to gather minimum of 75 points/sqmtr. 2) Patrolling shall at least cover the minimum corridor area as per the voltage classes. KM 1.729 3.867 43.101 48.6970
Reconductoring of 132kV Dhaligaon-Barnagar S/C Transmission Line with HTLS conductor and associated works
Dismantling of existing conductor of the transmission line, re-rolling on empty drums, removing of hardware fittings, insulators and accessories, loading and unloading, trasnportation to AEGCL store.
Survey Design Drawing Supply Erection Testing and Commissioning of 220 KV DC Transmission Line on DC Towers (07 KM Approx.) from Humnabad GSS to Humnabad Railway Traction Substation (RTSS) (with identification and resolution of RoW issues by payment
2: Conducting drone survey of Transmission lines for collection of data along with Aerial inspection of EHV line corridor using LIDAR method for measurements of vertical,horizontal and ground clearnace of the LT/HT/EHV/P&T lines, major roads/railway/river crossing/buildings, vegetations, etc., which is found to cross or running in parallel with the KPTCL exisiting EHV lines and sag measurements and other works
Reconductoring of 132kV Rangia-Nalbari S/C Transmission Line with HTLS conductor and associated works
Dismantling of existing conductor of the transmission line, re-rolling on empty drums, removing of hardware fittings, insulators and accessories, loading and unloading, trasnportation to AEGCL store.
Re-sagging of conductors at various location of 132 KV D/C Rihand-Garhwa Road Transmission line under jurisdiction of Transmission Sub Division Garhwa Road.
Restoration(Opening/closing) of Jumpers in lines.