Loading…
Loading…
939 results • Best match
Work of installation of distribution transformers and construction of associated HT/LT lines in low-voltage affected villages under the jurisdiction of 33/11 kV Sub-Stations Kanjabagh and Khatima Town of Electricity Distribution Division, Khatima
Laying/Stringing, Sagging, Testing and Commissioning of Weasel Conductor on HT Line, complete in all respects
Work of Strengthening of 11 KV Line under Business Plan 2026-27 in the Area of EUDD-11 KV and LT Line, North-Saint Lukes, Meerut.
Cartage of line Material from any Store of PVVNL to JE Store including loading & Unloading at both ends.
LT TOUCHING-2026-27-ELECTRICAL SECTION VELLIKULANGARA
Clearing touchings on LT lines , cutting tree branches,bamboo clusters,coconut cudjans etc as specified by Dept on annual basis (Rural/Remote) PART 1
TOUCHING UNDER 11KV PANANGAD, KUMBALAM AND UDAYATHUMVATHIL FEEDERS UNDER ES PANANGAD
Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified by dept.(Rural/Remote) – AMC -Part 1- 40 %
Work of substation earthing, overhauling of Power TF installation of double-circuit underground cables, and construction/strengthening of 11K HT/LT lines within the Industrial Area(Phase-2) under the jurisdiction of EDD-Mughalsarai BP 2026-27.
Shifting of existing 500 KVA 11/.4 KV S/S along with 11 KV and LT line at Badagada Kalyan Mandap Main Road in Ward No. 45
Civil and Services Works Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembły 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.