Loading…
Loading…
4,312 results • Best match
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT under DS Division Rampura
Outsourcing of Labour Part for Erection, Testing & Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development Works under DS Division Rampura
Outsourcing of Labour Part for Erection, Testing and Commissioning of Works Under DS Division Fazilka
Outsourcing of Labour Part for Erection, Testing & Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works such as Releasing of T/Well Connections, GSC/ISC Connections, De-loading of Overloaded T/Fs, Shifting of Meters Outside Consumer Premises, Earthing of DTs/Lines or any Development WorksUnder DS Division Fazilka.
Estimate for shifting of 100 KVA DTR Badaru adjoining area to safer side to ensure the children and staff also in (E) Section Local-II UESD Sarkaghat.
C/O LT Line
LE ECSC WORK IN FAVOUR OF SAJID KHALID ARATHODI (NEAMATH PEARL NEAR AMRITHA VIDYALAYAM KANNIYAMPURAM) (APPLICATION NO 2165332500464).
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc
Construction of 11 KV Compositive Electric Line on 18 mtr Wide Road B Block Sec 28 GIDA Gorakhpur
S/o ACSR Dog Conductor for HT line 03 Phase & LT Line 03 Phase with Saig. uppcl. SIR- 2025-26 Sl No. 62
Work
Replacement of damage stub at 132 KV Sandila-Mallawan Transmission line alongwith other associated works under Electricity Transmission Division, Hardoi with all cost of men, misc. consumables, mormal & special T&P etc. requird to be arranged by agency for satisfactory completin of the work, with all due care of safety & precations as per technical specifications and directions and direction of the supervising engineer, as per details below:-