Loading…
Loading…
4,400 results • Best match
AB Cable at Pased, Sinoula, Gar, Bhanar, Railapali, Nayi Basti Villages in 11 KV Vikas Bhawan feeder under Hawalbag Section under EDD, Almora
Dismantling of LT line 1 P 2 W (Weasel)
AB Cable at diff. villages feeded from 33/11 KV S/S Kosi under EDD, Almora
Dismantling of LT line 1 P 2 W (Weasel)
AB Cable at diff. village/Area feeded from Khatyari S/S under Hawalbag Section under EDD, Almora
Dismantling of LT line 1 P 2 W (Weasel)
Providing Irrigation facility through Lift Irrigation Scheme from Krishna river to the Yadurwadi (Site-1) village in Chikkodi Taluka, Dist-Belagavi (4702/2025-26/CMIDP)
Part B- Extension of LT line
Outsourcing of Labour Part for Replacement of lowlying PVC at road crossings with 4core cables and re locations of MCB, to maintain line symmetry and proper ground clearance, replacement existing 8 meter PCC poles with 9 meter PCC poles, replacem
Outsourcing of Labour Part for Replacement of low-lying PVC at road crossings with 4-core cables and re-locations of MCB’s, to maintain line symmetry and proper ground clearance, replacement existing 8-meter PCC poles with 9-meter PCC poles, replacement 1/1 MCB near road crossings with 4/1 MCB to reduce congestion of PVC cables, Re-sagging of LT/HT Lines, Relocation of poles which are causing hindrance to public in general, Replacement of multiple 4 core road crossing cables with single higher size 4 core cables, Providing distribution boxes for service cables on poles, Replacement of aged/deteriorated 4C LT cables, Rerouting of low-lying PVC lines, any other work related to provide better electrical clearance. Under DS City Patti Sub Division under DS Division Patti.
Outsourcing of Labour Part for Replacement of lowlying PVC at road crossings with 4core cables and re-locations of MCBs to maintain line symmetry and proper ground clearance replacement existing 8meter PCC poles with 9meter PCC poles replacement 1/1
Outsourcing of Labour Part for Replacement of low-lying PVC at road crossings with 4-core cables and re-locations of MCB’s, to maintain line symmetry and proper ground clearance, replacement existing 8-meter PCC poles with 9-meter PCC poles, replacement 1/1 MCB near road crossings with 4/1 MCB to reduce congestion of PVC cables, Re-sagging of LT/HT Lines, Relocation of poles which are causing hindrance to public in general, Replacement of multiple 4 core road crossing cables with single higher size 4 core cables, Providing distribution boxes for service cables on poles, Replacement of aged/deteriorated 4C LT cables, Rerouting of low-lying PVC lines, any other work related to provide better electrical clearance under DS Sub-division Tech-1 Bhabat under DS Division Zirakpur.