Loading…
Loading…
4,409 results • Best match
LINE WORK
DISMANTLING OF LT LINE 3 P 4W(WEASEL)
EE/D/KZI/ETW-44/25-26/29.12.25
Erection of LT Lines Stringing, Sagging, Binding for 7/2.59 ACSR & 7/2.50 AAAC Pin point
for the work of repairing 11 kv PCC pole/ ST Pole like (wiring/pole plinthing/conreting/growting) etc from under SE EUDC-1 GZB
Repair work shall be carried out by welding with plinth formation for approximately 100 steel (ST) poles, which are submerged below ground level in HT/LT lines at various locations. The repair shall be executed by inserting MS angles into the affected poles over a period of the next Six (06) months. The scope of work includes supply of all materials and execution of labour under Executive Engineer EUDD–Technical for 11 kV and LT network (City and South Side Ghaziabad-I), as per the following specifications. Note: All materials and labour shall be arranged and provided by the contractor.
Empanelment of Agencies for Restoration of Distribution Infrastructure during Emergency in Ashoknagar Circle
1.01 1st 11KV line-, DTR—Addl. & Aug. LT line (Cond.+ Cable), Service connection, 0.999 % of SoR Select Full Conversion INR
Quantum of works for installation of additional 16 KVA T/F at different places under EDD-Purwa, Unnao details as per given instruction by CE(D) Raebareli (85 Work).
Stringing & sagging of HT line by ACSR Weasel Conductor for jumper including all related work as joints /jumpers as required.
Shifting of Electrical Pole
SCOPE OF THE WORK-Estimate for shifting and Erection in Road Widening Work by R & B Division ,Nabarangpur. 1.15 Nos of 9 Mtr Long PSC Pole for Road Crossing & 64 Nos 8 Mtr Long PSC Pole on LT Line 3X50+1x35 +1x16 Sq mm LT AB Cable=2.17 Km and 3x35+1x25 mm2 LT XLPE Aerial bunched Cable=0.11 Km. 2. Dismentaling of existing LT line & Pole.