Loading…
Loading…
4,389 results • Best match
AMC work of 132/33 kV GSS, Noamundi for the period from 01.06.2026 to 31.03.2027 i.e. 304 days
Measurement & Testing of transmission line using fault locator or any other device (132 KV )
AMC work of 132/33 kV GSS, Kendposi for the period from 01.06.2026 to 31.03.2027 i.e. 304 days
Measurement & Testing of transmission line using fault locator or any other device (132 KV )
Replacement of Damaged 33kV, 3-Phase, 50Hz Outdoor Type ONAN Cooled CT-PT Combined Metering Unit along with other allied works at WSS Tangnar Stage 2nd
Supply, fitting, Laying of New 0.1 ACSR Conductor in for connecting the CT-PT unit with the 33kV system after extraction of the damaged Conductor from HT Lines.
Replacement of ACSR conductor by Aerial Bunch Cable with supply and erection of associate material under EDSD, Selaqui under EDD, Mohanpur.
Dismentaling of LT line 2P 3W (Weasel)
Deposit estimate for providing SOP to JSV rest house at Golwan by aug. of 63KVA 11/0.4 KV Golwan DTR to 100 KVA and LT aug 1 ph to 3 ph in (E) Section Pandol under ESD, HPSEBL, Lad Bharol.
Dismantalling Charges of 3 Ph LT line (30 mm²) :- De-Stringing , removel of conductor from Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. (3 Phase LT Line)
Electrical work
11KV HT Line