Loading…
Loading…
4,624 results • Best match
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
LIFT IRRIGATION WORKS
Construction of 3 phase 3 wire 11 KV HT line as per REC standard confirming to RE Rules 1956 excluding 400 Kg. 10 Mtr. Long PSC pole ...
19/EDC(H)/2026-27
Stringing & Sagging ABC Cable (3x95+1x70+1x16) sq mm. winding & jumpering of LT Line With AB Conductor as per RESSPO norms AB Conductor Provided by Dpt and balance materials lin ke holding clamp eye hook suspension clamp &dead end clamp arranged by the conductor
41/SE(T)/LCZ/2026-27
Fabrication & erection of single pole for LT line on 8.5 M long PCC pole with fixing of necessary clamps & other acessories like clamp hook, dead/suspension clamp,neutral clamp,ABC pressure clamp (if required) and danger board with clamp.(all material arranged by contractor except steel & pole if required).