Loading…
Loading…
4,675 results • Best match
29/SE(T)/LCZ/2026-27
Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x35) conductor as per RESSPO Norms. (AB Cable provided by deptt and balance material like holding clamp, eye hook, suspension clamp and dead end clamp arranged by contractor .)
14/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site
12/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site
07/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site
13/EDC(G)/2026-27
Cutting of tree branches for cleaning route of 11 KV/LT line at the work site
Supplying all materials, labour, T and P,construction of 11KV 3Ph 400 volt external Power Supply and 3-phase service connection to RWSS point at KODIGANDHI under Chitrakonda Block with testing, commissioning and handing over to TPSODL
Material with cost and construction of 3-phase 4 W LT Line with (3x35+1x25) mm2 AB cable considering 35 mtr span length using 200kg 8 Mtr long PSC Pole as per estimate of TPSODL (0.03 KM) including handing over to TPSODL.