Loading…
Loading…
4,701 results • Best match
Road Widening work for Improvement such as widening and strengthening to Paralakhemundi Municipality road from Ch.0/000Km to 10/400 Km, Gajapati.
Dismantling charges of LT Line
Work of Removal of Leakages and Chocking in various size pipe line for various PandT WSS under JEN section Kuchera under Jurisdictions of PHED Sub.Dn. Mundwa
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Work of Removal of Leakages and Chocking in various size pipe line for various PandT WSS under JEN section Mundwa under Jurisdictions of PHED Sub.Dn. Mundwa
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Augmentation of 2X20MVA, 66/11KV Power Transformer by 2X31.5 MVA, 66/11kV Power Transformers at 66/11KV Channagiri Sub-Station in Channagiri Taluk and Davanagere District including supply of equipments/materials, Dismantling and erection (including civil works), under Partial turnkey basis
... effective Erection, Testing, Commissioning & Operation of the Equipments of Substations & Transmission lines shall also be furnished by us, at no extra cost to you.
To provide the new connections and other works under full deposit scheme EDD Dhampur Running
Trimming of Tree branches crossing in the route of different spans of 33 KV/11KV/LT Lines.
Electrification of Newly constructed Vidhi Vigyan Prayogshala Bhavan at Vill. Bilbai under EDD, Banda (Rural)
The work of erection of 11 KV OVERHEAD/UNDERGROUND HT Lines/Sub-Staton on 8.5/11 Mtr. long PCC/ST Poles with ACSR Weasel/Dog/Rabbit Conductor/XLPE ...