Utility shifting in connection with Kunnathukal- Karakonam road widening work, under Electrical Section Kunnathukal
221 - Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
Constructing 11kV OH line with Covered Conductor 1.2km Fitting and erecting 9mts PSC pole 20Nos Fitting and erecting A pole PSC pole 17Nos Constructing DTR DP and erection of 100kVA Transformer 1No Fitting and erecting DP structure
Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
Misc Electrical works
Liaison with different units of the supply authority i.e. Division/Sub Division/Section offices/MRT office/E & MR office and field staff etc. for obtaining shut down of 11KV line/LT Line, breaking of meter seal if required to carry out the repairing and maintenance works of the Sub Station and re-energization, testing etc. as required.
Constructing 11kV line from Konikallu to Kooliyodanmukku and Installing 100 kVA DTR
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.
Erection of 110 KV DC Line on DC tower (2.690kM)by making LILO in the existing 110 KV Theni Periyar I Feeder for the Proposed K.K.Patty 110 kV SS with supply of all materials(Reach 3)
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Erection of 110 KV DC Line on DC tower (2.490kM)by making LILO in the existing 110 KV Theni Periyar I Feeder for the Proposed K.K.Patty 110 kV SS with supply of all materials(Reach 2).
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.