53/2025-26 Repair Of Pipeline Leakage In Junior Engineer Section Second Under Sub. Division Dausa Rural
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
60/2025-26 Repair Of Pipeline Leakage In Under Sub. Division Ramgarh Pachwara
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Work for Removal of Leakages in various size pipe lines for UWSS Nagaur under jurisdiction of PHED Sub. Dn. City, Nagaur.
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Repairing and Maintenance work at Various JJM Schemes under Div. Bundi District - Bundi
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Annual rate contract for removing of leakage/choking in difference size of pipe line under Phed Jen section Badwasi
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
Construction and Maintenance of Power and Electrical works etc at Bodhjungnagar Industrial Estate PACKAGE 11
Supply Installation and Commissioning of Indoor 33 KV 1200Amp 5 Panel VCB Breaker Panel (Including Two Incomer & Three Outgoing) with inbuilt Line CT, PT, Power Pack and Transmission Line Protection Protection for I/C panel & 1 Nos. O/G panel and Transformer protection for 2 O/G panel etc all complete as per approved drawing