RATE CONTRACT OF REMOVAL OFLEAKAGE UNDER JEN SECTION KERU SUB DN MANDOR
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
RATE CONTRACT OF REMOVAL ILLEGAL CONNECTION UNDER SUB DN MANDOR
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
ARC FOR MAINTENANCE OF EXISTING DISTRIBUTION MAIN PIPE LINE WILL ALL OTHER REPAIRING WORK UNDER JEN SECTION BHANDU KALLA SUB DN DOLI
... valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site ...
OILDEPOSIT_25_26_02 Widening and Strengthening of Roads - Stretch - 1 (ABC) (From Namdang chariali to 2 No. Sologuri Gaon upto OIL Location HAAR/HXQ) under deposit fund of Oil India Limited, Duliajan for the year 2025-26 of District-Dibrugarh (Tingkh
Utility Shifting :- 1. Shifting of LT, HT lines, Transformer & other accessories belongs to APDCL to a suitable location if necessary utilising by old serviciable materials as approved & with new materials wherever required as per departmental satisfactions.
REPAIR/ MAINTENANCE OF LT INFRASTRUCTURE AND MISC E/M WORKS AT DIV AREA UNDER GE MISSAMARI
S & F PVC/ Fibre Separator for LT Lines 1100 Volts OH Conductor 2 Wire system for horizontal spacing of Conductor, fixing with Nuts, Bolts, Washers, etc, including taking old unserviceable one. complete all as specified and as directed.
Construction of Kaliabori ELIS under Boko-Chaygaon (ST) LAC under SOPD-G for the year 2025-26 under Boko-Chaygaon-Chamaria Division (Irrigation) Boko (Package no. 01)
Drawal of 11KV HT Line 800 m (Approx.) & Erection of 63 KVA Transformer Sub station ALIGNMENT OF HT LINE: Surveying and finalising the suitable tapping point in existing near by 11kV line in consultation with APDC LandDepartmental Officers, marking the alignment of the line considering Right of Way, Feasibility etc. as required and as directed Analysis for 0 to 500 M Length