Loading…
Loading…
1,112 results • Best match
Unloading and Loading of molecular sieve and activated alumina in the PPU Beds of ASU - 3 at Oxygen Plant - 2
Hiring of Crane 9 Ton for Area Store MANDSAUR Against 100 percent Testing of DTRs and loading and unloading DTRs and Materials
Hiring of a crane 9 Ton capacity with driver for A/s MANDSAUR for Minimum Run 25 Days Per Month (for 8 Hours Per Days) which are being operated during 2026-27 ( 12 Month period) for 100% Transformer Testing & Loading unloading of Transformer & Materials at respective Area stores MANDSAUR under the administrative control of the E.E. (Store) M.P.P.K.V.V.Co.Ltd., MANDSAUR
Hiring of Crane 12 Ton for Area Store Ujjain Against 100 percent Testing of DTRs and loading and unloading DTRs and Materials
Hiring of a crane 12 Ton capacity with driver for A/s Ujjain for Minimum Run 25 Days Per Month (for 8 Hours Per Days) which are being operated during 2026-27 ( 12 Month period) for (1) 100% Transformer Testing & (2) Loading unloading of Transformer & Materials at respective Area stores Ujjain under the administrative control of the E.E. (Store) M.P.P.K.V.V.Co.Ltd., Ujjain
Operation of Isolators on loading/unloading lines at Nayagarh (NYG) station in Jakhapura(JKPR)-Jaroli(JRLI) section for three years through outside agency.
A-Operations of Isolators on loading/unloading lines at Nayagarh (NYG)
Loading of Reels, Bundles, Copier boxes, Note Book and Providing Equipment Operator for unloading of reel, shifting work at Mayanur Godown
Shifting of paper reels/ sheet bundles/copier boxes at Mayanur Godown as per the instruction of the Officer-in-charge-8338000088
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Telecom; Tirunelveli BA - Outsourcing of the dismantling of Old Power Plant & Battery, Transportation/Loading/Unloading, Installation of New Power Plant & Battery, Ass..
Transportation/Loading/Unloading