Loading…
Loading…
4,883 results • Best match
Hiring of agency for Steel Pipe(8 inch Dia) Transportation, Loading Unloading , from Thrissur GA Kerela to Jaunpur GA U.P
Transportation of (Quantity :11 KM) 8"NB LPE coated Carbon Steel Pipeline by 40 Ft Trailer from IOAGPL Thrissur GA Kerela, to IOAGPL Jaunpur GA U.P.-Unloading/Loading,.(Weight of 12 mtr Pipe : 384 KG) Trailer LWH-FT-(40x8x7)
Transportation of Furniture, Round Timber, granules including loading from Furniture unit Masani, and unloading in the districts of Haryana. Also loading unloading of Round Timber and granules from spot to Masani (Per KM Basis) for the year 2025-26.
Custom Bid for Services - Loading, Transportation & Unloading and Wagon loading of coal from surface coal yard of TLCMP to KCHP Similar Category Goods Transport Service – Per KM Based Service
Transportation & Unloading and Wagon loading of coal from surface coal yard of TLCMP to KCHP Similar Category Goods Transport Service – Per KM Based Service
Manual unloading of Indigenous coal from Railway wagons and Loading into Tipper Lorries, Transporting and unloading, heaping, ramping by using Pay loaders and Bull Dozer at reclaimable area of ECHS coal stock yard
Charges for Manual unloading of Indigenous coal received from SCCL through Railway wagons which involves monitoring the arrival of wagons at AIPS NCTPS-I Railways siding, placing the railway wagon for manual unloading after obtaining the E/RR Railway receipts from the loading end and verifying with actual wagon received, opening both side doors for unloading of coal from the wagons, clear the unloaded coal continuously by pay loaders on both the sides of entire rake for further unloading, clearing the coal boulders from the wagon wheels and track for the free movement of the rake and closing the doors after unloading, coordinate with Railway staff for dispatch clearance of empty rake including maintaining the documentation of rake wise, day wise of rake unloaded, Timing of each and every stage of unloading, rake placement till completion of entire rake exit time from AIPS railway siding and Loading the SCCL coal from Manual Unloading area into Tipper Lorries , Transporting, unloading, heaping and ramping using Pay-Loaders, Bull Dozers at reclaimable area of ECHS coal stack yard – I & IV/As per the direction of Engineer-In-Charge for the usage of NCTPP – III including hire charges for pay loaders (Front end loaders/Dozers) and water wetting of the dusty roads from Railway yard to ECHS coal yard roads to avoid dust pollution during the coal transportation including T & P’s & cost of consumables etc. (Necessary water required for road wetting may be taken from the hot water out let channel inside NCTPS premises)
Loading/Unloading, Stevedoring, Other related works from UTL owned or chartered ships at Bitra
Stevedoring charges during Fair Season for handling upto minimum cargo as per Penalty and Incentive Clause
Tender for Loading and unloading of material of various works under ED HPSEBL Baijnath.
Loading and unloading of material of various works under ED HPSEBL Baijnath