Loading…
Loading…
123 results • Latest
E-Tender for Labour Work for 1 Phase & 3 Phase New Connection And Rectification work under Mahuva Rural 1 Sub Division
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and PGVCL/Tech/UG
Providing and Laying Underground Sewerage Networks in Zones 12-1 and 12-2 and Constructing In-line Pumping Station 12-2-1 at Odiampet in Puducherry
Lowering, laying and jointing H.D.P.E. pipes and specials in proper position by butt fusion welding / electro fusion welding joints using fusion equipments as per ISO 21307 - 2011 and as per IS 7634 (Part-II) -2012 including cost of hire charges for butt fusion equipments powersupply arrangements etc, complete-225 mm dia HDPE pipe for all classes
Providing and Laying Underground Sewerage Networks in Zones 13-5 and 14-3 and Constructing In-line Pumping Stations 13-5-1,14-3 1,14-3-2 and 14-3-3 at Thengaithittu and Ariyankuppam in Puducherry
Lowering, laying and jointing H.D.P.E. pipes and specials in proper position by butt fusion welding / electro fusion welding joints using fusion equipments as per ISO 21307 - 2011 and as per IS 7634 (Part-II) -2012 including cost of hire charges for butt fusion equipments powersupply arrangements etc, complete-225 mm dia HDPE pipe for all classes
Providing and Laying Underground Sewerage Networks in Zones 13-Park and 14-2 and Constructing In-line Pumping Stations 13-Park- 6, 13-Park-1 and 14-2-1 at Nainar Mandapam and Murungapakkam in Puducherry
Lowering, laying and jointing H.D.P.E. pipes and specials in proper position by butt fusion welding / electro fusion welding joints using fusion equipments as per ISO 21307 - 2011 and as per IS 7634 (Part-II) -2012 including cost of hire charges for butt fusion equipments powersupply arrangements etc, complete-225 mm dia HDPE pipe for all classes
Construction of Section office Building & other allied works at Holavanahalli (KPTCL Land), Koratagere Tq.
Providing full nosing for 20mm thick granite slab using required machinery including cost and conveyance of all materials, labour for all items of work, HOM of equipment etc., complete as per specific...
Augmentation of Coaching Running Room at Visakhapatnam and upgradation of Coaching crew lobby at Visakhapatnam in the section of SSE/W/North and West/WAT under the jurisdiction of ADEN/Estate/WAT.
Laying of Railway supplied UG Cable of Metre different size: Along the Road double Cable :---- The price shall cover the cost of transporting the UG cable from stores of work incharge office, or, other premises as directed by work incharge to work site & laying of double cable shall be completed with contractors men & materials. Double cable laying along the road/track after excavation of earth in any type of soil. The dimension of trench, number of bricks, sand bedding etc., shall be confirming to the CEE/ECoR/BBS latest drawing No. CEE/GS/Cable Trench/01 (Mod-1). The cost is also inclusive of refilling of earth, levelling of earth to be done by contractors' labour, tools and materials. The work is to be completed with the contractors' labour, tools and all required materials including erection, testing and commissioning. Price is also inclusive of refilling levelling and dressing of earth to be done contractors labour, tools and materials. The IR values of cable to be measured before and after laying of the cable.