Loading…
Loading…
14,752 results • Best match
Operation and Maintenance of PURBA CHUTIAKHORE piped water supply scheme including Oand M of IE Plant
Operation & Maintenance Of PURBA CHUTIAKHORE piped water supply scheme including O& M of IE Plant (Pressure Type) installed for the Scheme in Chopra Block of Uttar Dinajpur district Under Raiganj Division,PHE Dte [for a Period of 12 (Twelve) Months]
Renovation of sewerage, drainage line and laying pavers block from House of M Das Gupta to House of Naresh Mishra in ward No 32 under MC Adityapur
Earth work in excavation for laying of different types and sizes of R.C.C. spun pipes with disposal of excavated earth within intial lead and lift as per specification and direction of E/I. (i) For classification of soil item -A.[JSOR DWSD- 3.3.1(i)]
Day to day valve operation for Zone-V and Zone-VI under Mandirbazar Block under Mega Surface Water Based Water Supply Scheme for Falta Mathurapur under South 24-Pgns Water Supply Division-I, PHE Dte.
Operation and Maintenance Of KANKI-MATIARI piped water supply scheme including Oand M of IE Plant
Operation & Maintenance Of KANKI-MATIARI piped water supply scheme including O& M of IE Plant (Pressure Type) installed for the Scheme in Goalpukhur-II Block of Uttar Dinajpur district Under Raiganj Division,PHE Dte [for a Period of 12 (Twelve) Months]
Plaster work, Wood work, Painting, Water supply and sanitary installation and allied works.
Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes SDR 7.4 U V stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply including all PP - R plain & brass threaded polypropylene random fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall
AUGMENTATION / UPGRADATION OF EXTERNAL WATER SUPPLY AND STORAGE SYSTEM AT CME PUNE
Excavation over areas in any kind of soil using mechanical means (Hydraulic excavator) or manual means for foundations of manholes etc. or for shafts, walls, cesspits, manholes, pier holes, laying pipes or underground cables, road, path etc., not exceeding 1.5 m in width and not exceeding 1.5 m in depth and not exceeding 10 Sq.M on plan, lift upto 1.5 m, including dressing the sides and ramming the bottom and getting out the excavated soil complete all as specified.